I have a Telerik RadGrid with a column holding a date in the 8/20/2009 12:00:00 AM format.
I need to display it as 8/20/2009.
I'm using the following code in the grid definition:
<MasterTableView>
<Columns>
<telerik:GridBoundColumn DataField="Boarding Date" DataFormatString="{0:MM/dd/yyyy}"/>
</Columns>
</MaterTAbleView>
Grid has more columns, but I think I don't need to add all of the columns to a MasterTableView in order to forma just one.
How can I do it?
Related
I want to extract company name and its contract price and cost only from 2-14jan 2022? How can i do that?
Thank you
Here's a sample setup with raw data in Columns A-E
Cells H1, H2 has the date inputs which you can manipulate accordingly.
formula:
=FILTER(C:E,B:B>=H1,B:B<=H2)
alternate formula:
=QUERY(A2:E,"SELECT C,D,E WHERE B>=DATE '"&TEXT(H1,"yyyy-mm-dd")&"' AND B<=DATE '"&TEXT(H2,"yyyy-mm-dd")&"' ")
NOTE: the above formula(s) are bound to throw error incase the date in your second column is not a proper date format and rather a text date
I have imported a CSV file to the spreadsheet that includes columns with Dates and timestamp (Columns D,E,K,L) and I'm currently facing 2 problems with these columns.
Some rows are formatted as text/string and I can't seem to change it to date format. I tried manually changing it via format>number>datetime but it remains the same.
the format of the date is being read incorrectly by spreadsheet. For example, 5/11/2018 is being read as May 11, 2019 but if you try to review the spreadsheet, it should be read as November 5, 2018. I tried playing with the format and spreadsheet settings to no avail.
Spreadsheet Sample
I'd appreciate any inputs.
UPDATE
For Column D & E, I have already converted all rows to Date but the problem persists where in some rows are being read as DD/MM/YYYY and some rows MM/DD/YYYY. This creates date discrepancy when I try to make data visualization using these data:(
I am unable to convert all rows in Column L to date format. Some rows are still being read as text/string.
if you have a spare column you can use this formula to correct it:
=DATE(RIGHT(A1; 4); MID(A1; 4; 2); LEFT(A1; 2))
also, you can try to change locale settings in your spreadsheet because it looks like that your spreadsheet uses mm/dd/yyyy format as default. eg. you can try for example Czech locale where default is dd/mm/yyyy
To format custom dates in Google Sheets:
Highlight the column to be formatted.
Navigate the app's menu path:
Format >> Number >> More Formats >> More data and time formats
Put your cursor in the top field of the popup and edit as necessary...
Delete parts you don't want.
Add parts you do want (but make sure you're adding them left-to-right).
Put character(s) between the fields as separators.
Format each part via its dropdown list of options.
Click the "Apply" button, and you're done.
I'm using the query API to insert a datetime with this format: '2013-06-25T21:57:25.033-07:00'
But in the table it only shows up with date-precision, the time is dropped. How can I include the time?
You need to configure the column to the correct date format on the Fusion Table in question.
Open Google Fusion Table Interface > Change Column > Select Date/Time Column > Select Appropriate Date Format: http://i.stack.imgur.com/OUz4N.png
I have a default scaffolded view and in the list view, all my integer values are shown with digit grouping. (like 5,129)
I couldn't find a way to disable this behavior. I tried on both English and Turkish locale. I am not sure if it is used but the messages.properties file is all default values:
default.date.format=yyyy-MM-dd HH:mm:ss z
default.number.format=0
If I change the view and add g:formatNumber around the value such as
<g:formatNumber number="${fieldValue(bean: tagInstance, field: 'tag_id')}" type="number" groupingUsed="false" />
all that gets printed is 5 (for the number 5129)
Eliminating the fieldValue() call fixed it.
${tagInstance.tag_id}
prints the number without any formatting.
Have you tried this:
default.number.format=#
Note that the # will cause a value of 0 to not display. If you want it to display, you'll probably want:
default.number.format=#0
I have data :- 31-May-07
Its in a calculated column of the list. The method I used to get it :- =IF(FDate="","",TEXT(FDate,"dd-mmm-yy")) {FDate is a DateTime type of column. The returned value is stored in a "Single Line of Text" column type.}
I am now unable to sort that column as its Text now and sorting is done on basis of strings.
I need to sort this column on basis of Date.
Any help ?
Thanks!!
I'm not familiar with Sharepoint but this looks like a pure Excel question. I presume you don't really want to convert the date into text. Let it be a date and just change the cell format.