I need to migrate a TFS 2013 instance to Azure DevOps Server 2019. I want to setup a new instance of Azure DevOps server with all the data migrated over from TFS 2013 and both the instances up and running at the same time. The plan is to decommission the TFS 2013 instance after a few weeks.
For testing purposes, I followed the steps below:
1. Setup a server in a completly isolated network.
2. Backed up the TFS 2013 databases using the scheduled backups from TFS admin console.
3. Restored the databases to a new instance of SQL Server 2017.
4. Started installation of Azure DevOps Server 2019 on the new server, I pointed it to the restored databases and it detected the schema and gave me two options: Production Upgrade and Pre-production upgrade testing. I chose the latter option.
The installation wizard took care of remapping the db connection strings(tfsconfig remapdbs), changing server and collection ids(tfsconfig changeserverid) and removed the scheduled backup jobs to avoid conflicts with the existing TFS 2013 instance.
The test migration completed successfully. Now, I want to setup the production instance on new servers that are within the same network as the existing TFS 2013 instance.
Shall I select "pre-production upgrade testing" again as I need to have both TFS 2013 and 2019 running at the same time?
Or Shall I select "Production Upgrade" this time? Is there anything I need to take care of during the upgrade so that the two instance don't conflict with each other?
PS: there are no backup jobs running on the TFS 2013 instance.

I tried the "Production upgrade" and understood that it will perform an in-place upgrade. In my scenario, I wanted to setup a separate new instance and the "Pre-Production Upgrade Testing" is the appropriate choice in this case as it automatically takes care of the remapping of database connection string and change server and collection identifiers.

Related

TFS SQL Upgrade Error TF400787: The 'DefaultCollection' cannot be started

I setup a 3 tier TFS preprod environment that includes: an application server, a build server and one database server (SQL Server 2016).
I restored SQL Server databases from the production environment to the preprod environment, installed TFS 2017 on the app server, attached the database and tested successfully.
I then upgraded TFS 2017 to TFS2018 and tested successfully. I restored the databases from SQL Server 2016 to SQL Server 2017, updated compatibility mode on the databases to SQL Server 2017, stopped the collection in preprod environment, edited settings to point to the new SQL Server 2017 instance, clicked Test (which was successful), saved, clicked Start Collection and got an error
TF400787: The host 'DefaultCollection' cannot be started. The servicing needs to be scheduled and completed before the host can be started.
The TFS account I'm using to run TFS Admin Console is a sysadmin on all databases: TFS_Configuration, TFS_DefaultCollection and TFS_Warehouse.
How can I resolve this error and attach "DefaultCollection?"
How can I resolve this error and attach "DefaultCollection?"
The cause of this problem seems to be the loss of data in the database.
Generally, there will be backup database when using tfs or before tfs upgrade. You could use the backup of the databases to restore the database.
Here are the steps to re-configure the TFS:
Step1: Unconfigure the TFSfeature. You could use the "Remove feature" option in Administration console to remove feature or use the TfsConfig setup / uninstall:All
Step2: Restore the database from the backup.
Step3: Configure the TFS again in Administration Console.
In addition, you could go to TFS Administration Console -> the target collection -> Status tab. Then you could find the job that is failed, try to click the Rerun Job button and check the result.
Here is the ticket with a similar issue, you can refer to it

TFS 2010 Upgrade to TFS 2013 - Can Window Server 2019 Standard Support the Upgrade?

We are looking to carry out the following TFS upgrades in our Production environment:
Upgrade TFS 2010 to TFS 2013.5
Upgrade TFS 2013.5 to TFS 2019
To support both migrations, we have a Windows Server 2019 Standard edition to host the Application Tier. The Data Tier is to be installed on a dedicated SQL box.
The Microsoft website however lists Windows Server 2012 (Essentials, Standard, Datacenter) as the latest server operating system edition required for TFS 2013.
My question therefore is, can we still perform this planned upgrade to TFS 2013 on a newer edition of Windows Server, in our case Windows Server 2019 Standard edition?
I agree with Daniel, please follow the documentation exactly.
Since you can upgrade from TFS 2010 --> TFS 2012.3 --> TFS 2019, or from TFS 2010 --> TFS 2013.5 --> TFS 2019, you could consider trying to upgrade from TFS 2010 to TFS 2012.3 or TFS 2013.5 on the same Windows Server 2008 R2 Enterprise server, and then migrate to Windows Server 2019 Standard edition when upgrade to DevOps Server 2019.1.1(TFS 2019.1.1).
"Supported" means "tested and known to work". Later OS versions haven't been tested and may not work, or TFS may not even install in the first place.
I've done dozens of TFS upgrades in my day. My suggestion is to follow the documentation provided by Microsoft exactly. If an OS isn't listed as a supported OS, then don't use that OS.
So after much to-ing and fro-ing and numerous debates and suggestions from various sources on Stackoverflow, in the end this is how I managed to successfully complete my migration upgrade from TFS 2010 to Azure DevOps Server (TFS) 2019.1
There are however 5 very important points I wish to emphasise:
This was a complete migration upgrade (not an In-place upgrade) and so each move to a later TFS version was done using new/replacement hardware.
Both upgrades were done, based on the excellent YouTube tutorial by Mohamed Radwan which can be found here and relies heavily on the TFSBackup and TFSRestore utilities, both of which have shipped with all versions of TFS, I believe since the 2012 edition.
I only migrated the TfsConfiguration database and our Project database.
There was no migration of SharePoint.
There was no migration of Reporting Services.
We had no scheduled backups set up in the TFS 2010 Admin console.
TFS 2010 to TFS 2013 - Some Useful Points to Note
The backup of my TFS 2010 databases were executed from the Tools directory of the TFS 2013 instance (once installed), on the new dedicated hardware for my app tier.
Following a successful database restore using the TFSRestore utility, there are generally three key tasks required which use the TFSConfig tool to ensure data integrity between the two TFS instances aren't compromised or corrupted. These are the PrepareClone, ChangeServerID and RemapDB tasks executed in this same order.
The PrepareClone task failed when executed and after days of trying to troubleshoot the issue, I gave up in the end due mainly to the fact that the PrepareClone command removes information about scheduled backups, SharePoint, and Reporting resources from an Azure DevOps Server deployment and is used in two circumstances:
When you move a deployment to new hardware but want to keep using the old deployment.
When you clone an Azure DevOps Server deployment.
We didn't have any scheduled backups, SharePoint or Reporting Services included within the scope of our migration and were certainly not planning to keep using the old deployment long-term, except for a few days of validation and testing of the migration upgrade. As such, I ignored the error.
I was also counting on the fact that if the ChangeServerID command run successfully, this would ensure that the two instances were now discrete anyway, having been assigned unique GUIDs. Fortunately, the ChangeServerID task succeeded.
I also then executed the RemapDB command but in truth this wasn't even required as the ChangeServerID command had already completed the remapping task.
From this point on, the migration went like a dream and there was absolutely no issues encountered. Another key point to add, the backup of our TFS 2010 instance was done only after I'd ensured there was no user logged onto the system and following the backup, I took the 2010 instance completely offline.
TFS 2013 to Azure DevOps Server (TFS) 2019.1 - Some Useful Points to Note
Again using the TFSBackup and TFSRestore utilities (this time from the Azure DevOps Server 2019.1 Tools directory) and pretty much repeating the steps for the previous migration upgrade, I managed to get us onto our target 2019 instance without single hitch.
Even better, with Azure DevOps 2019, the TFSConfig PrepareClone, ChangeServerID and RemapDB tasks have been incorporated into the app tier configuration wizard, meaning you're not required to manually run them from the commandline. The tool takes care of it for you in its entirety, which is excellent!!
The new Pre-Production Upgrade option enabled me to simulate and somehow perform a dry-run of the final upgrade, another excellent feature incorporated into the Server Configuration Wizard for Azure DevOps Server 2019.1
My Concluding Remarks
Judging by how easy and simple it was to use, its heavy use of automation and clearly being far less likely to result in any disaster, I am rather surprised the TFSBackup and TFSRestore tools aren't recommended as perhaps the current best migration options, subject of course to the type of migration targeted.
I have done TFS upgrades in the past which were based on the older process of quiescing the project collection, detaching and re-attaching the database(s) to the target instance, etc, etc and must admit there's hardly any chance I'd be going back to that in future if I can help it, as the TFSBackup and TFSRestore tools are a much, much better, safer and reliable option in my view.
Hopefully, this feedback will help the next person who may embark on a similar journey to upgrade TFS from the 2010 edition to a later version.

How to test new TFS server without upgrading original

We have a TFS 2013 instance that requires upgrading. I plan to use Azure DevOps 2019 on prem. I'd like to have the two environments running at the same time so I can verify. What I'd like to do is:
Do full install of Azure DevOps server, creating new DBs on a new SQL server. I do NOT want to upgrade our existing TFS at this point.
Copy the data from the original TFS SQL instance to the new SQL instance, performing an upgrade along the way.
Test and verify all data successfully migrated to 2019
Schedule a blackout window and repeat the import process once again
Can anybody advise if this is do-able or refer me to a guide?
Tks
Easier than I thought. Just needed to run the pre-production upgrade wizard.

In place TFS 2012 to TFS 2013 upgrade?

We have created a VM clone of our TFS server (but haven't turned on networking yet for the clone).
We have created a test SQL server that we plan on using for the test upgrade.
I'm not sure what we should do first (after populating the tfs databases on the test SQL server).
Since our test TFS server is a VM clone, TFS is installed and configured already. The Cloned TFS server is pointing to our production SQL server. Are the following steps correct:
Turn on networking for the Cloned TFS server
Remote into the Cloned TFS server
Run command TFSServiceControl quiesce
Run the command TFSConfig PrepareClone
Run the command TFSConfig ChangeServer ID
Run the command TFSConfig RemapDBS
Update the TFS URLS in the admin console
Edit Reporting to point to the new test Reporting instance
Update all service accounts
Are the steps correct? I am not sure which order to carry out the steps out after the TFS databases have been put on the test SQL server. Any help would be greatly appreciated.
I would suggest doing the following:
Unconfigure your test server. I assume you don't want to upgrade your production server yet, you just want to test the upgrade, correct? If that's the case run 'TfsConfig.exe setup /Uninstall:All' to unconfigure the new server.
(if you haven't done it already) Backup all TFS databases from production server. You'll need all DBs with the names starting with 'Tfs_' including Tfs_Configuration, Tfs_Warehouse and all collection databases.
Restore TFS backups from production on VM or some other test SQL server (using SQL server management studio)
Run tfsconfig changeserverid command (on the new server) to change the TFS server id. It's required because you want to have both TFS instances live for some time. If you don't do it, VS clients will think that it's the same server (even though the name is different) and this can cause some issues.
Run tfsconfig remapdbs command (on the new server) which will fix the old Tfs_Configuration database. This is only required because you are moving TFS to a different machine (with a different name)
Now you can start TFS management console and perform the actual upgrade which is pretty straightforward. Upgrade wizard will ask you for the new service account names and new test reporting instance location.

Replacing TFS App Tier

I plan on replacing my existing app tier (TFS 2010) when upgrading to TFS 2013. I'll quiesce the services and rename the old machine from MYTFS to MYTFS_OLD. The new app tier will have a fresh, un-configured installation of TFS 2013 and will be renamed from MYTFS_NEW to MYTFS.
My question is, will it be necessary to run the ChangeServerID or RemapDB commands if the new app tier is named the same as the old one?
If I understand your scenario correctly you will end up with:
A new server that's completely clean
The 'old' database server that contains all the TFS databases.
If that's the case, you should install TFS and select 'Upgrade'. You then point your TFS Application Tier to your database server and let TFS upgrade your databases.
You cannot have both version running on the same set of databases.
Study the ALM Ranger's Upgrade guide before doing anything.
I don't think you need to run remapdbs or changeserverid commands:
you typically need remapdbs when the server name changes which is not the case
you should use changeserverid if you plan to clone a TFS server meaning that you have restored TFS databases to a different machine and set up another TFS instance on that machine without killing the original server. Again it's not the case from what you have described here.