While i am working on managing my sprints in Visual Studio Team Services, all my sprint options on the left pane has disappeared, therefore i can't see my previous and future sprint work items when i select work items under backlogs tab.
Any idea ?
I ran into this too, but could not find the Other Links section. I had to do the following, but there must be a better way so this isn't necessary.
Go to the Project's home page
Click on the Gear icon to enter the settings area for the project
This should default to the Overview Tab, with a list of teams on the right.
Click on the team
Click on the Work tab
Click on the Iterations sub tab
Click on the green plus sign to add the new iteration created previously
This happens when you set or select a specific sprint as your "set as team's backlog iteration" and the solution for this is to the following:
1) From the project homepage in VS Team Services.
2) Click on "Configure Schedule and iterations" link under other links section.
3) Select "Iterations" tab.
4) Set "set as team's backlog iteration" option to the top level.
5) You will notice check boxes have shown, where you can select which iterations to show or hide.
6) That's all! you will be able to view all selected sprints either previous/current or future ones!
Related
I do not know why I can't see Roadmap feature in Jira.
And in the project setting, I can see that Roadmap is auto enabled.
In a Jira Cloud Scrum project, the Roadmap feature is configured per board.
To enable it for your board, you will likely need to:
Navigate to your desired board
Click the three dots in the top right corner
Click Board Settings
On the left hand Board Settings click Roadmap
Toggle the Enable the roadmap for board button
I'm using Visual Studio Team Service to manage my source code. I have 2 projects.
At sections view and edit file in repository, 1 project display file by light background while another one display by dark background.
Does anyone know how to change light background?
Follow the steps below:
Click on your account in the up-right corner and select "My profile".
Click "Edit profile" on the displayed page.
Click "Preference" tab.
Set UI Theme to "Default".
Save the changes.
I'm running TFS 2015 on-prem. How do you hide the "Features" pane in the backlog view?
Click "Mapping". In the screenshot you provided, it's set to "On". Turning it off will hide the Features pane.
Does anyone know if it is possible to add multiple jiras to a sprint in one operation. Consider I do a search for a particular label I have on my backlog jiras. I then want to add all of these to the next sprint. Is this possible or do I have to do it one by one
Thanks
When you using Greenhopper and you are on the Agile screen you can do it like mdoar said and using [Shift] or [Ctrl] to select multiple issues. If you start dragging them a small red circle appears indicating how much issues you are about to move to your sprint.
As you did not clearly state, that you are using Greenhopper/Agile, there is another way:
You can use the issue navigator and bulk edit all those issues and edit the sprint field.
Therefor you click on Tools on the top right of your issue search result and select all xy issues. Then you will be forwarded to the buld edit page. There you select the issues you want to edit or simply check the first check box to select all isues. Then you select Next and Edit Issues. Scroll down and check Edit Sprint and enter the Sprint you want those issues to be added to. Check if you want to receive a notification via Email for that bulk edit. Click Next and Apply to apply your changes.
I think you can select multiple issues to drag into a sprint using the usual click, move the mouse, shift click, or however you would select multiple values in your OS and browser
In VS Team 2010, is there a way to link a work item from Project A to a work item in Project B?
Go to the All Links tab of the work item
Click the Link to button. This will open a dialog
Click the Browse... button next to the Work Item IDs label. This will open up a
new dialog
At the top of this dialog, you can change the Project