Challenges faced while working in different time zones [closed] - timezone

As it currently stands, this question is not a good fit for our Q&A format. We expect answers to be supported by facts, references, or expertise, but this question will likely solicit debate, arguments, polling, or extended discussion. If you feel that this question can be improved and possibly reopened, visit the help center for guidance.
Closed 10 years ago.
I am sure there are many developers out here who have team spread across different time zones. What are some of the challenges people face and whats the best way to tackle them?

I currently work in a different time zone than the rest of my team. The biggest challenge is early in the morning and late in the afternoon when some of us haven't started work for the day or some have already left for the day.
It's just part of the work effort and we all respect each others valuable time. If it's something critical (and that's a relative term) then we just call the team member or page/text the whole team. If that happens then we all respond as needed. No big deal. Because of the respect factor, we know to only use this if necessary.
During the normal working day we just use the standard stuff like email, phone, and IM.

In all honesty, any company that has split development of a project across time zones is out of touch with the realities of engineering. The MBAs, in an attempt to save themselves a buck or two, foist upon their engineers the unenviable position of altering the schedules of their lives - leading to high stress, longer work hours, lower morale, and higher turnover. Quality suffers, ship dates suffer, feature lists suffer. The only increase you'll see in your project is the bug count.
You can have engineering projects split up like this if you don't have any need for low-latency communication between project units. In other words - if they are working on almost entirely independent segments of the system.

We have a team that is distributed or has to work across 3 or 4 different timezones. In the course of this we have faced several challenges primarily relating to communication.
Meetings are tough to arrange at a convenient time for all team members to attend, so there can sometimes be a need to have subsets of the team meeting, or to forego the team meeting approach for an individual update approach where one primary team member is responsible for a particular overseas team.
Another issue is work handover and communication. For example, we have a resource in India and if they have a problem that causes them to stop work, it can take 2 or 3 days out of their schedule if we don't respond quickly enough, all due to the time difference. Therefore, it is imperitive that we not only schedule diverse work to fill these delays but that we also respond to their queries in a timely manner. We often assign testing tasks to resources in this particular timezone as that is often an asynchronous task without an end.
In addition, you need to have a good change management system and code repository. The more asynchronous you can make the communication channels, the better, and this goes for information exchange as well (such as source and issue tracking).
There is no reason why you can't make distributed teams work, especially in the current age where we can work from almost anywhere as long as we have a link to the Internet. However, it's important to know where your bottlenecks are in a project and to ensure that work is distributed accordingly.

If you dont have a great process which has tuned exclusively for this kind of a scenario, then different time zone is going to kill your project deadline. Atleast one side should be very flexible to adjust their time for the meetings. But ofcourse that will eventually create frustrations among the team members.
Check out this SO thread which talks about Outsourcing and its practical issues, I think you will get some points from there too https://stackoverflow.com/questions/111948/outsourcing
Or Outsourcing Tag - https://stackoverflow.com/questions/tagged/outsourcing

We have these kinds of issues with support - we are using 3 commercial SDKs and the support teams are in distant time zones (8-10 hours difference). Moreover, not all work days overlap.
This fact had a big impact on my reverse engineering abilities :)

Plan, plan and plan some more. A few other things to note:
1) Be aware of local holidays if the team is in other locales, e.g. different countries may have different holidays. For example, some sects celebrate some Chrisian holidays 2 weeks later than most Christians,e.g. some orthodox sects I'm thinking.
2) Plan on meetings at a specific time that may be outside the normal work hours. This was particularly true when there was a 13 hour time difference between the rest of the team and myself.
3) Be aware of "Core hours" with the time change, e.g. if I'm on Pacific time and want to update something in New Jersey on Eastern time and I do it at 5pm Pacific time, that is 8 pm Eastern time and there may not be anyone there to notice the change or test it before the following morning which may mean some support person gets up at 4:30am Pacific time as in the East some have started to show up for work and go, "Huh? Why isn't this working like it did yesterday?"
There is also the other obvious things of being aware if there are various alphabets involved, e.g. Latin, Cyrillic, Arabic, etc. and this may affect how a computer interprets some text entered.

Related

How to estimate number of days and log daily work in Jira? [closed]

Closed. This question is opinion-based. It is not currently accepting answers.
Want to improve this question? Update the question so it can be answered with facts and citations by editing this post.
Closed 1 year ago.
Improve this question
I am a newbie to Agile methodology and I somewhat am afraid when I am working on Jira User Stories assigned to me. I have below questions.
How to provide estimate for a task or user story assigned to me? I mean what all factors should I consider? There are some stories for which I have to do some research and then develop. While other members in the team provide estimate in days for their user stories, I feel afraid to ask for more.
Once I am working on the user story, how should I log my work. I mean, once I am researching for the topic, does those hours also count or only those hours when I am actually writing code. Also, out of the total 9 hours per day, do I have to log 9 hours complete for the day or just those hours in which I actually worked and not counting lunch time and meeting times.
If I don't log 9 hours per day, the number of days I will work will surpass the assigned number of days. Is that so?
Any help is appreciated.
How to provide estimate for a task or user story assigned to me? I mean what all factors should I consider? There are some stories for which I have to do some research and then develop.
An approach that works for me is to start with a guess of how long something will take and then add some extra time for:
Any uncertainty
Unusually complex tasks
Tasks with lots of dependencies
While other members in the team provide estimate in days for their user stories, I feel afraid to ask for more.
My advice would be to under promise and over deliver. For example, if you estimate 2 days and it actually takes less than 2 days then people will be happy. If you continually underestimate how much time it takes to do tasks then it will be disruptive and unpopular.
Once I am working on the user story, how should I log my work. I mean, once I am researching for the topic, does those hours also count or only those hours when I am actually writing code.
Everything you do towards completing a task should be included in the estimate. That includes if you have to do research or background reading. Remember that when you learn something new it is valuable to your organisation as it improves your capability. They should want you to be learning!
If I don't log 9 hours per day, the number of days I will work will surpass the assigned number of days. Is that so?
In development we usually estimate in ideal days. An ideal day imagines if you only worked on the one task and had no other distractions. The number of ideal days worked is never the same as the number of actual days worked. It is not unusual for an ideal day to take 1.5 or more real days.
This is what I do in my company:
i. Business requirements gathered from manager/product owner (PO) with businesss owner / stakeholders.
ii. PO and developers list down all the features that are needed to implement, from business scopes into features.
iii. Discussion to put high/medium/low priorities for v1, v1,1, v1,2 and so on (Google Minimum Viable Product (MVP)), agreed by business owner.
iv. Product owner/manager/developers and designer to come out wireframes (usually sketches) with those features discusssed earlier.
v. Confirmed wireframe by product owner and developers with stakeholders, the designer comes out final UI.
vi. Create stories, from there you plan how long each stories. If the feature is huge, make it as Epic, split into smaller stories, and plan the time for implementation (based on the developer who is going to do, NOT your manager to decide your implementation time). If you afraid to ask for more, and if you can't finish the task on time, that's your problem. Always be honest and frank to everyone, that's your team, they won't bite. If you fail, everyone fails. So if you finish earlier, pick new stories inside Backlog, and plan your estimation better in next sprint. You can ask for some "buffer" time to do research on certain features which is unclear in implementation for stories estimation, before implementation is officially started.
Log ONLY your working hours on that stories. Never log your lunch time (of course!). My previous company was doing "realistic" and "honest" Agile, putting realistic estimation of 6 hours/day for developers (admit that devs as human beings are using the rest 2 hours to watch cats videos, drink water, toileting, flirting, chit-chat, slacking etc).
Refer to 2. You should plan your estimation better, based on your experience and ability on spending on your tasks. If you finish all the tasks very earlier than expected estimation time, or over-commit your promise, are considered bad/failed sprint. Improve it on next sprint.

Where to begin for basic machine algorithms for, say, document recognition and organization?

Pardon if this question is not appropriate. It is kind of specific and I am not asking for actual code but moreso guidance on whether or not this task is worth undertaking. If this is not the place, please close the question and kindly point me in the correct direction.
Short background: I have always been interested in tinkering. I used to play with partitions and OS X scripts when I was younger, eventually reaching basic-level "general programming" aptitude before my father prohibited my computer usage. I am now going to law school and working at a law firm but I love development and I want to implement more tech innovation in the field.
Main point: At our firm, we have a busy season every year from mid march to the first week of april (immigration + H1B deadline). We receive a lot of documents and scanned files that need to be verified, organized, and checked.
I added (very) simple lines of code to our online platform to help in organization; basically, I attached tags to all incoming documents, and once they were verified, the code would organize them by tag (like "identification doc", "work experience doc" etc.). This would my life much easier every year, as I end up working 100+ hour weeks this season.
I want to take this many steps further with an algorithm that can check for signatures and data mismatches between documents and ultimately organize the documents so they are ready to print. Eventually, I would like to maybe even implement machine learning and a very basic neural network to automate the whole mind-numbing and painful process...
Actual Question(s): I just wanted to know the best way for me to proceed or get started. I know a decent amount of python and java, and we have an online platform already with the documents. What other resources would you recommend in terms of books, videos, or even classes? Is there a name for this kind of basic categorization? Can I build something like this through my own effort without an advanced degree?
Stupid and over-dramatic epilogue: Truth be told, a part of me feels like I wasted my life thus far by not pursuing what I knew I loved at the age of 12. This is my way of making amends I guess, and if I can do this then maybe I can keep doing it in law and beyond...
You don't give many specifics about the task but if you have a finite number of forms in digital form as images, then this seems very possible.
I have personally used OpenCV with Python a lot and more complex machine learning tasks have become increasingly simple in the past 10 years.
Take for example object detection (e.g. 1, 2) to check whether there is anything in a signature field or try extracting the date from an image (e.g 1, 2).
I would suggest you start with the simplest thing that would improve your work. A small and easy task will let you build up your knowledge on how to do things.

Software development metrics and reporting [closed]

Closed. This question needs to be more focused. It is not currently accepting answers.
Want to improve this question? Update the question so it focuses on one problem only by editing this post.
Closed 2 years ago.
Improve this question
I've had some interesting conversations recently about software development metrics, in particular how they can be used in a reasonably large organisation to help development teams work better. I know there have been Stack Overflow questions about which metrics are good to use - like this one, but my question is more about which metrics are useful to which stakeholders, and at what level of aggregation.
As an example, my view is that code coverage is a useful metric in the following ways (and maybe others):
For a team's own internal use when combined with other measurements.
For facilitating/enabling/mentoring
teams, where it might be instructive
when considered on a team-by-team
basis as a trend (e.g. if team A and
B have coverage this month of 75 and
50, I'd be more concerned with team A
than B if the previous month they'd
had 80 and 40).
For senior management
when presented as an aggregated
statistic across a number of teams or
a whole department.
But I don't think it's useful for senior management to see this on a team-by-team basis, as this encourages artifical attempts to bolster coverage with tests that merely exercise, rather than test, code.
I'm in an organisation with a couple of levels in its management hierarchy, but where the vast majority of managers are technically minded and able (with many still getting their hands dirty). Some of the development teams are leading the way in driving towards agile development practices, but others lag, and there is now a serious mandate from the top for this to be the way the organisation works. A couple of us are starting a programme to encourage this. In this sort of an organisation, what sort of metrics do you think are useful, to whom, why, and at what level of aggregation?
I don't want people to feel their performance is being assessed based on a metric that they can artificially influence; at the same time, the senior management are going to want some sort of evidence that progress is being made. What advice or caveats can you provide based on experience in your own organisations?
EDIT
We are definitely wanting to use metrics as a tool for organisational improvement not as a tool for individual performance measurement.
A tale from personal experience. Apologies for the length.
A few years ago our development group tried setting "proper" measurable objectives for individuals and team leaders. The experiment lasted for just one year, because hard metrics didn't really work very well for individual objectives (see my question on the subject for some links and further discussion).
Note that I was a team leader, and involved in planning it all with my technical boss and the other team leaders, so the objectives weren't something dictated from on high by clueless upper management -- at the time we really wanted them to work. It is also worth noting that the bonus structure inadvertently encouraged competition between developers. Here are my observations on the things we tried.
Customer-visible issues
In our case, we counted outages on the service we provided to customers. In a shrink-wrapped product it might be the number of bugs reported by customers.
Advantages: This was the only real measure that was visible to upper management. It was also the most objective, being measured outside the development group.
Disadvantages: There weren't that many outages -- just around one per developer for the whole year -- which meant that failing or exceeding the objective was a matter of "pinning blame" for the few outages that did occur in each team. This led to bad feeling and loss of morale.
Amount of work completed
Advantages: This was the only positive measure. Everything else was "we notice when bad things happen," which was demoralising. Its inclusion was also necessary because, without it, a developer who did nothing all year would exceed all the other objectives, which clearly wouldn't be in the interests of the company. Measuring the amount of work completed checked the natural optimism of developers when estimating task size, which was useful.
Disadvantages: The measure of "work completed" was based on estimates provided by the developers themselves (usually a good thing), but making it part of their objectives encouraged gaming of the system to inflate estimates. We had no other viable measure of work completed: I think the only possible valuable way of measuring productivity is "impact on the company bottom line," but most developers are so far removed from direct sales that this is rarely practical at an individual level.
Defects found in new production code
We measured defects introduced into new production code during the year, as it was felt that bugs from previous years should not count against any individual in this year's objectives. Defects spotted by internal quality teams were included in the count even if they didn't impact customers.
Advantages: Surprisingly few. The time lag between the introduction of a defect and its discovery meant that there was really no immediate feedback mechanism to improve code quality. Macro trends at a team level were more useful.
Disadvantages: There was a heavy focus on the negative, since this objective was only invoked when a defect was found and we needed someone to blame for it. Developers were reluctant to record defects they found themselves, and a simple count meant that minor bugs were as bad as severe problems. Since the number of defects per individual was still quite low, the number of minor and severe defects didn't even out as it might with a larger sample. Old defects were not included, so the group's reputation for code quality (based on all bugs found) did not always match the measurable introduced-this-year count.
Timeliness of project delivery
We measured timeliness as the percentage of work delivered to internal QA teams by the stated deadline.
Advantages: Unlike counting defects, this was a measure that was under immediate, direct control of the developers, as they effectively decided when the work was complete. The presence of the objective focused the mind on completing tasks. This helped the team commit to realistic amounts of work, and improved the perception by internal customers of the development group's ability to deliver on promises.
Disadvantages: As the only objective directly under the developers' control, it was maximised at the expense of code quality: on the day of a deadline, given the choice between saying a task is complete or doing further testing to improve confidence in its quality, the developer would choose to mark it complete and hope any resulting bugs never come to the surface.
Complaints from internal customers
To gauge how well developers communicated with internal customers during development and subsequent support of their software, we decided that the number of complaints received about each individual would be recorded. The complaints would be validated by the manager, to avoid any possible vindictiveness.
Advantages: Really nothing I can recall. Measured at a sufficiently large group level it becomes a more useful "customer satisfaction" score.
Disadvantages: Not only highly negative, but also a subjective measure. As with other objectives, the numbers for each individual were around the zero mark, which meant that a single comment about someone could mean the difference between "infinitely exceeded" and "did not meet".
General comments
Bureaucracy: While our task management tools held much of the data for these metrics, there was still quite a lot of manual effort involved to collate it all. The time spent obtaining all the numbers was not enjoyable, generally focused on negative aspects of our work and may not even have been reclaimed by increased productivity.
Morale: For the measures where individuals were blamed for problems, not only did those with "bad" scores feel demotivated, but so did those with "good" scores, as they didn't like the loss in team morale and sometimes felt they were ranked higher not because they were better but because they were luckier.
Summary
So what did we learn from the episode? In later years we tried to re-use some of the ideas but in a "softer" way, where there was less emphasis on individual blame and more on team improvement.
It is impossible to define objectives for individual developers that are objectively measurable, add value to the company and cannot be gamed, so don't bother to try.
Customer issues and defects can be counted at a wider team level, if the location of the defect is unequivocally the responsibility of that team -- that is, you don't ever have to play the "blame game".
Once you measure defects only at the level of responsibility for a code module, you can (and should) measure old bugs as well as new ones, since it is in that group's interest to eliminate all defects.
Measuring defect counts at a group level increases the sample size per group, and so anomalies between minor and severe defects are smoothed out and a simple "number of bugs" measure can mean something, such as to see if you are improving month-on-month.
Include something that upper management care about, because keeping them happy is your primary purpose as a development group. In our case it was customer-visible outages, so even if the measure is sometimes arbitrary or seemingly unfair, if it's what the bosses are measuring then you need take notice too.
Upper management don't need to see metrics they don't have in their own objectives. This way it avoids the temptation to blame individuals for errors.
Measuring timeliness of project delivery did change developer behaviour and put a focus on completing tasks. It improved estimation and allowed the group to make realistic promises. If it were easy to collect the timeliness information then I would consider using it again at a team level to measure improvement over time.
All of this doesn't help when you are required to set measurable objectives for individual developers, but hopefully the ideas will be more useful for team improvement.
The key thing about metrics is knowing what you are using them for. Are you using them as a tool for improvement, a tool for reward, a tool for punishment, etc. It sounds like you're planning to use them as a tool for improvement.
The number one principle when setting metrics is to keep the information relevant so that the person receiving it can use it to make a decision. Most likely a senior manager cannot dictate the micro level of whether you need more tests, less complexity, etc. But a team leader can do that.
Therefore, I don't believe a measure of code coverage is going to be useful to management beyond the individual team. At the macro level, the organisation is probably interested in:
Cost of delivery
Timeliness of delivery
Scope of delivery & external quality
Internal quality won't be high on their list of things to cover off. It's a development team's mission to make it clear that internal quality (maintainability, test coverage, self-documenting code, etc) is a key factor in achieving the other three.
Therefore you should target metrics to more senior managers which cover off those three such as:
Overall Velocity (note that comparing velocity between teams is often artificial)
Expected vs Actual scope delivered to agreed timelines
Number of production defects (possibly per capita)
And measure things like code coverage, code complexity, cut 'n' paste score (code repetition using flay or similar), method length, etc at a team level where the recipients of the information can really make a difference.
A metric is a way of answering a question about a project, team or company. Before you start looking for the answers, you need to decide what questions you want to ask.
Typical questions include:
what is the quality of our code?
is the quality improving or degrading over time?
how productive is the team? Is it improving or degrading?
how effective is our testing?
...and so on.
Each question will require a different set of metrics to answer. Collecting metrics without knowing what questions you want answered is at best a waste of time and at worst counterproductive.
You also need to be aware that there is an 'uncertainty principle' at work - unless you are very careful the act of collecting metrics will change people's behaviour, often in unexpected and sometimes detrimental ways. This is especially so if people believe they are being evaluated on the metrics, or worse still have the metrics tied to some reward or punishment scheme.
I recommend reading Gerald Weinberg's Quality Software Management Vol 2: First Order Measurement. He goes into a lot of detail on software metrics, but says the most important are often what he calls "Zero Order Measurement" - asking people their opinion on how a project is going. All four volumes in the series are expensive and hard to get hold of, but well worth it.
Software writing
What must be optimised?
CPU(s) use, memory(s) use, memory cache(s) use, user time use, code size at run-time, data size at run-time, graphics performance, file access performance, network access performance, bandwidth use, code conciseness and readability, electricity use, (count of) distinct API calls used, (count of) distinct methods and algorithms used, maybe more.
How much must it be optimised?
It must be optimised the minimum reasonable amount (except in areas where surpassing acceptance test criteria is desirable) required to pass acceptance tests, facilitate maintenance, facilitate audit and meet user requirements.
("... for legal/illegal input test data and legal/illegal test events in all test states at all required test data volumes and test request volumes for all current and future test integration scenarios.")
Why the minimum reasonable amount?
Because optimised code is harder to write and so costs more.
What leadership is required?
Coding standards, basic structure, acceptance criteria and guidance on levels of optimisation required.
How can success of software writing be measured?
Cost
Time
Acceptance test passes
Extent to which acceptance tests it is desirable to surpass are surpassed
User approval
Ease of maintenance
Ease of audit
Degree of absence of over-optimisation
What cost/time should be ignored in assessing aggregate performance of programmers?
Wasted cost/time incurred because of requirements (inc architecture) changes
Extra cost/time incurred because of deficiencies in platforms/tools
But this cost/time should be included in assessing aggregate performance of teams (inc architects, managers).
How can success of architects be measured?
Other measures plus:
Instances of "avoiding early" being affected by deficiencies in platforms/tools
Degree of absence of changes in architecture
As I said in What is the fascination with code metrics?, metrics include:
different populations, meaning the scope of interest is not the same for developer or for manager
trends meaning any metrics in itself is meaningless without its associated trend, in order to take the decision to act upon it or to ignore it.
We are using a tool able to provide:
lots of micro-level metrics (interesting for developers), with trends.
lots of rules with multi-level (UI, Data, Code) static analysis capabilities
lots of aggregations rules (meaning those vast number of metrics are condensed in several domains of interests, adequate for higher level of populations)
The result is an analysis which can be drilled-down, from high level aggregation domains (security, architecture, practices, documentation, ...) all the way down to some line of code.
The current feedback is:
project managers can get defensive very quickly when some rules are not respected and make their global note significantly lower.
Each study has to be re-tailored to respect each project quirks.
The benefit is the definition of a contract where exceptions are acknowledged but rules to be respected are defined.
higher levels (IT department, stakeholder) use the global notes just as one element of their evaluation of the progress made.
They will actually look more closely at other elements based on delivery cycles: how often are we able to iterate and put an application into production?, how many errors did we had to solve before that release? (in term of merges, or in term of pre-production environment not correctly setup), what immediate feedbacks are generated by a new release of an application?
So:
which metrics are useful to which stakeholders, and at what level of aggregation
At high level:
the (static analysis) metrics are actually the result of low-level metric aggregations, and organized by domains.
Other metrics (more "operational-oriented", based on the release cycle of the application, and not just on the static analysis of the code) are taken into account
The actual ROI is achieved through other actions (like six-sigma studies)
At lower level:
the static analysis is enough (but has to encompass multi-level tiers applications, with sometimes multi-languages developments)
the actions are piloted by the trends and importance
the study has to be approved/supported by all levels of hierarchy to be accepted/acted upon (in particular, budget for the ensuing refactoring has to be validated)
If you have some Lean background/knowledge, then I would suggest the system that Mary Poppendieck recommends (that I've already mentioned in this previous answer). This system is based on three holistic measurements that must be taken as a package:
Cycle time
From product concept to first release or
From feature request to feature deployment or
From bug detection to resolution
Business Case Realization (without this, everything else is irrelevant)
P&L or
ROI or
Goal of investment
Customer Satisfaction
e.g. Net Promoter Score
The aggregation level is product/project level and I believe that these metrics are helpful for everybody (developers should never forget that they don't write code for fun, they write code to create value and should always keep that in mind).
Teams may (and actually do) use technical metrics to measure quality standards conformance which are integrated in the Definition of Done (as "no increase of the technical debt"). But high quality is not a end in itself, it's just a mean to achieve short cycle time (to be a fast company) which is the real target (with Business Case Realization and Customer Satisfaction).
This is a bit of a side note to the main question, but I had a very similar experience to Paul Stephensons answer above. One thing I would add to that is about collection of data and visibility of metrics.
In our case, the development director was meant to collate a bunch of data from various disparate systems and distribute individual metric results once a month. This often didn't happen, as it was a time consuming job and he was a busy man.
The results of this were:
Unhappy developers, as performance bonuses were based on metrics and people didn't know how they were getting on.
Some time consuming multiple entry of data into various different systems.
If you are going down this route, you need to be sure that all metric data can be collated automatically and is easily visible to those it affects.
One of the interesting approaches that's currently getting some hype is Kanban. It's fairly Agile. What's particularly interesting is that it permits a metric of "work done" to be applied. I havn't used/encountered this in actual practice yet, but I'd like to work towards getting a kanban-ish flow going at my job.
Interestingly I just finished reading PeopleWare, and the authors strongly discourage individual metrics being made visible to superiors (even direct managers), but that aggregate metrics should be very visible.
As far as code specific metrics I think it's good for a team to know the state of the code at the current time, and to know the trends affecting the code as it matures and grows.
The question is obviously not focussed on .NET, but I think the .NET product NDepend has done a lot of work to define and document common metrics that are useful.
The documentation section on metrics is educational reading, even if you're not doing .NET.
Software metrics have been with us for a long time and as best I
can tell nothing to date has emerged individually or in aggregate
that is capable of guiding projects during development. The nut of
the problem is that we want to use objective measures and these
can only measure what has happened,
not what is happening or about to happen.
By the time we have measured, analyzed and interpreted some
series of metrics we are reacting to things that
have already gone wrong, or very occasionally, gone right.
I don't want to underplay the importance of learning from
objective metrics but I do want to
point out that this is a reactive not a pro-active response.
Developing a "confidence index" may be a better way of monitoring
whether project is on-track or headed for trouble. Try
developing a voting system where a reasonable number of
representatives from each project area of interest are asked
to anonymously vote their
confidence from time to. Confidence is voted in two areas:
1) Things are on-track 2) Things will continue to be on-track or get
back on-track.
These are purely subjective measurements from people closest to the
"action".
Feed the results into a Kanban type chart where the
columns represent voting areas and you
should have a pretty good idea where to focus your attention. Use
question 1 to evaluate whether management reacted to the
previous voting cycle appropriately. Use question 2 to identify
where management should focus next.
This idea is based on each of us having a comfort level
within our own area of responsibility. Our confidence level
is a product of experience, knowledge within our
domain of expertise, the number and severity of problems
we are facing, the amount of time we have to accomplish our
tasks, the quality of the information we are working with and
a whole bunch of other factors.
MBWA (Management By Walking Around) is often touted as
one of the most effective tools we have - this is a variation of it.
This technique is not much use at the level of
individual teams because it only reflects the general mood
of the team. Kind of like using someone’s watch to tell them
the time. However, at higher levels of management it should
be quite informative.

Best practices for customer involvement in Agile development? [closed]

Closed. This question is off-topic. It is not currently accepting answers.
Want to improve this question? Update the question so it's on-topic for Stack Overflow.
Closed 11 years ago.
Improve this question
We need to involve our customer development partners in our development process. We're more or less following Agile methodologies. Some customer partners are remote, others closer. We need to minimize travel costs.
Our customers are in health care and tend to be busy, expensive, and hard to schedule.
What practices and technologies have worked to support customer involvement? We're using phone calls, phone conferences and email. We're curious about leveraging wiki techniques and would love to hear what's worked for others.
it doesn't matter whether the customer is in the same cubicle or halfway around the planet, except for communication delays - the critical factor is availability.
a customer that is too busy to answer your emails for several days is going to cause your iteration to be late, or fail
the customer has two critical commitments for agile:
available to answer questions in a timely manner
not to change their mind/priorities during an iteration
the customer must commit to a reasonable service-level agreement (SLA) on availability, e.g. 1-hour response time, or 24-hour response time, etc., and you will need to adjust all estimates and schedules by the lag factor. If the customer will not commit or does not follow through, cancel the iteration and re-plan, bringing the customer's commitment to the forefront again. Do not just "guess" at what you think the customer might want.
Bottom line: without a customer commitment, agile will not work.
My experience with Agile methods is mostly for desktop applications. When our customers are remote, we've spent time to get an engineer to the customer site to configure/install a demo rig. The engineer works with the customer on a test and demo setup/plan that will provide an environment that the customer believes replicates the important aspects of the deployment environment but isolates the demo system from existing infrastructure (so that we can push updates whenever we need to). The engineer also sets up deployment systems to move our applications into production, so that we can "deploy" without being on site. Our applications can self-update (either for each release or each build) and we carefully instrument the releases to log all errors and submit all crashes as bugs to our bug tracker. This way we at least know what went wrong, even if we don't know what's going right.
For each release/build that shows up on the customer's test rig, we provide a (short) screencast, narrated by the project lead or primary developer, demo-ing any new features. The release notes contain any long-term issues or questions we want the customer to think about (i.e. issues that can't be resolved immediately by a phone call or email), and the application displays these notes for the user.
Finally, and possibly most importantly, we get the customer and/or the customer's liaison an account on our calendar server and configure their calendar app to make use of that account. This then goes both ways--we can schedule time (on site, phone, email, etc.) with the customer and they can do the same with our developers.
One option: Install a customer proxy at the "customer partner" site who can extract the information that you need when those customers are available. Have these proxies build the solid relationships that allow them to represent the customer view. Their time is all yours. And when questions arise that they cannot answer, they have ready access to your customer partners - even if in the coffee line.
The whole point of the customer in agile is to have open and free discourse with the developers (IE immediate feedback). If your actual customers cannot provide this, then you need an intermediary/proxy that can fill this role. You don't need actual customers, you just need someone that can represent the customers' interests well enough to meet your customers' needs.
Just a few ideas:
If you do choose to use a Wiki, make sure it supports a whole-wiki-wide "recent changes" list, and preferably one that is specific to the users. The less distant from development people are, the more likely to have email as a metaphor for their computer use. If they can't immediately tell when there's something new for them to see, they will never explore it. You also preferably need ways to signal to them that you need their attention to matters, or they will treat changes like CCs.
I'm a big believer in creating video screen captures of interactions (narrated) and distributing them to users. Unlike a real demo, customers don't feel like they need to interrupt, and they can rewind and re-watch the same interaction over and over, paying attention to little details.
Finally, if you do distribute prototypes, make sure to send someone (or at least a screen sharing session) to see how the prototypes are used. Contextual design is effective. You can count on people using your prototype differently from the way you expect, and you have to understand how they use it to really understand where the issues are, even if they don't report them.
Have you considered something like LogMeIn.
This would allow customers to either log-in to a PC on your network already running your application, or alternatively allow you to install/update the application on one of their computers.
This would solve the remote customer issue and would also support the ongoing continual customer feedback requirement in the agile process.
I used it a previous company for technical support, but there is no reason (except maybe cost) that it would not work for your situation.
It is also a great way to actually see how users are using your application and therefore find out what works and what doesn't.
First of all, make sure that you have a product manager or a product owner close the the developers. This person will be managing the relationship with the customer.
Then, the product manager can demonstrate the product to the customer at the end of each iteration and also ask customers question when the developer need feedback to implement a user story.
It is amazing the positive feedback you can get from customers when you involve them.
We did not use a wiki and most of the communication is done via E-Mail, phone, and a screen sharing application (we are using GoToMeeting, but there are tons of alternative out there).
You should probably do a kick-off once with everyone at one place. Face-to-face time is invaluable. That includes all developers. Prepare some metaplan questions, but also have enough time to just mingle.
I think by most definitions of Agile processes that have high dependence on customer involvement you've already missed "best practice", which would be for an on-site, and preferably "in-team" customer present at all times. So I suppose we're looking for a "next-best practice". :)
There's the possibility of introducing a "proxy customer" on-site. I have to admit to being very sceptical about the value of a proxy customer. I'm concerned about the risk of introducing some sort of second-rate and otherwise unnecessary business analyst function to the mix, with the increased signal-to-noise ratio and potential for garbled messages. It also carries the risk of allowing busy real customers to reduce their involvement in the process, which is likely to lead to dissatisfaction. I wonder if there might be someone with good domain knowledge who has recently retired and might be available to act in this capacity as a consultant?
Communication bandwidth with remote customers is astonishingly lower than face-to-face, something I had not fully realised until I started dealing with users in another country. Even with video the loss is significant.
How long are your iterations? How hard is planning iterations? Might it be easier to go for longer iterations and get more planning done less frequently, or reduce iteration length and go to smaller, but more frequent planning sessions? Are more than one customer involv
Do you have a useable and available build at the end of each iteration? Is there time for involved users to have hands-on time before the next planning session? Keeping users engaged by shipping frequently would seem on the surface to be a Good Idea, which perhaps legislates for small frequent iterations (a week? two weeks?)
The wiki idea might work: have you looked at the FIT Framework? It's a sort of integrated acceptance test/wiki, which might help in getting acceptance tests from remote customers. I think I'd also look to provide some sort of (separate or integrated) "project dashboard", possibly pushed regularly to key customers as well as available on demand. use it as a substitute for things like post-its on whiteboards, Big Visible Charts and the like. There are a number of open-source or low-cost options that may serve - writing your own simple alternative need not be too time-consuming or costly, either.
Above all, remember that "Agile" is a kind-of catch-all label for developments that are carried out with an emphasis on the values and principles espoused in the Agile manifesto. What is considered "best" in one situation may not be so in another. If you understand the principles and regularly review your methods with a critical eye then you're probably going to be close enough to the best practice application to your situation.
I haven't looked at it for some time but with Beck and Fowler on the author list, there should be something useful in Planning Extreme Programming.
In my previous position #drchrono.com I aggregated data/feedback/iteration requests from 20,000 clinicians across the country. The best way to do this is to to evangelize a site like uservoice.com. I held "daily live web demonstrations" with sometimes 50 to 100 doctors (doctors signed up right from our website). In these demos I would demonstrate our current product and evangelize user voice to drive their feedback into a useful tool for our development team. All of this was done remotely and led to a 1,400% overall increase in recurring revenue growth.

How do I represent features v. tasks in FogBugz 6?

In FogBugz 6, how do I represent the concepts of a "feature" versus a "task"? As defined by Joel Spolsky, the owner of Fog Creek Software (which makes FogBugz), a feature is essentially a user-visible capability. To estimate the time to implement a feature, the developer should break the implementation into short tasks (2 days max) to ensure they think about each step.
FogBugz has only cases. I can't tell whether they're supposed to correspond to features or tasks. Some FogBugz documentation indicates that each case is a task, which is fine except there is no way to group all the tasks for a given feature together. This is especially odd given that, before FogBugz 6, Joel advocated using a spreadsheet with that grouped all the tasks for each feature. But his own software doesn't appear to meaningfully support that grouping.
I realize that the Joel article I reference includes a disclaimer pointing to a later article. However, the later article does not settle this issue, in fact it doesn't discuss features versus tasks at all, which is surprising given how well Joel advocates for those concepts in the first article.
For FogBugz 6.0 and earlier:
Make a case for each work item (task). FogBugz calls them "Features," only to distinguish them from bugs, but you do want one case for each task.
The best way to group a bunch of tasks is to make a Release (Fix-For) and assign all of the tasks to that release.
Responding to AviD's comment/question to Joel:
So, if you have 10 new features coming
in the next version, with each feature
needing 5 tasks to implement, you
recommend creating 10 releases? And
how do I define that these are the
features/"releases" that are to be
included in the upcoming release?
Here is how we dealt with this specific problem in our development process:
First, we made a regular release schedule: monthly internal releases and quarterly external releases. This schedule never changes but task assignment / feature completion does. This is hugely important in terms of simplifying our inter-human communication: don't try to argue with the calendar.
Major features ("10 new features" in your example) are turned into cases (e.g., case 101 to case 110).
Each task that is a sub-component of a major feature also gets created as a sub-case with a description of what makes this chunk of work an important part of the larger picture. Previously, in Fogbugz 6, we used the "See also" feature by allowing it to search the text for us ("This is a sub-component of case 101" for example). This was effectively the same thing but less aesthetic.
Now that we've broken down the work to its finest level of usefulness, we bring the actual developers into the discussion. Each task and major feature is individually assigned to a particular developer.
The developer determines when they can get their assigned work done by picking the appropriate internal release date that they think they can commit to.
At this point, we have a rough sketch of what will get done for each release. Further refinements continue as the working people actually estimate the hours that they'll need to do the work, enabling evidence-based scheduling, etc.
For AviD's question, though, he would have the release-assignment problem solved by step 5 above.
However, I think point 6 is the most interesting as that's where you really get a solid schedule. For example, if developers are having trouble estimating a larger task, they break it down into sub-cases even further. Notice how my assessment of "finest level of usefulness" can differ (perhaps greatly) from the person who really needs to get the work done.
This is also a time when a developer can reach out to someone else and say "I can do most of this but it would really help if person X could help me with this little piece Y." This is actually where I get most of my development tasking: I personally sit in multiple places during this process, from large-scale planning meetings to little fiddly tasks that no-one else has time to do.
PS: Making it a personal goal to get this answer rated higher than Joel's.... ;-)
PPS: My original response is now overcome by events since Fogbugz 7 has lovely sub-tasks. Program managers love those reports.
You may have better luck asking your questions in the FogBugz Discussion Forum
We use a combination of projects in order to accomplish your grouping goals. We also commonly setup a project "parking" Wiki where links to development cases, technical documentation, systems requirements, user documentation, external links to resources etc. can all be placed. It provides a good "one-stop-shop" for everything related to that project.
As part of that Wiki, we would then setup two specific projects. One in relation to the large overall goals/outlines similar to what might correspond to your Project Management charts/whatnot. One in relation to the development tasks of each feature as they are broken down into the smaller and more manageable chunks. You can then, as was mentioned use case linking to both reference the "master" cases in the other project as well as reference the project Wiki itself so that you can quickly and easily get back to all of your project related information which is conveniently in one spot.
You can accomplish a pile of different organizational structures using FogBugz, you just have to approach things a little differently sometimes in order to hit each and every situation.
Hope that helps.
haha, that article has a disclaimer, but I understand what you are saying.
We use Fogbugz and the only 'Feature' that I am aware of is under category and I don't think you can associated it with sub-tasks.
You can type in 'Case N' is the feature for this task if you just wanted to reference it in the case text.
That kind of stuff sound like is lies more in the project management domain instead of software used to track bugs.
thats a good question, i have asked that myself, too..
we currently test-drive fogbugz for 45 days in a group of 5 developers, and we currently create a "release" for major features. in fact we do not release it, but multiple releases together when something is ready.
there should definately be some sort of advanced task grouping in fogbugz.