How to have Dask workers terminate when done? - dask

I can't just shut down the entire cluster like in this answer because there might be other jobs running. I run one cluster in order to avoid having to use Kubernetes. Jobs get submitted to this cluster, but they call into C libraries that leak memory.
The workers run one thread per process, so it would be acceptable to terminate the entire worker process and have it be restarted.
I can't just use os.kill from the task itself because the task's return value has to be propagated back through Dask. I have to get Dask to terminate the process for me at the right time.
Is there any way to do this?

Related

Dask workers get stuck in SLURM queue and won't start until the master hits the walltime

Lately, I've been trying to do some machine learning work with Dask on an HPC cluster which uses the SLURM scheduler. Importantly, on this cluster SLURM is configured to have a hard wall-time limit of 24h per job.
Initially, I ran my code with a single worker, but my job was running out of memory. I tried to increase the number of workers (and, therefore, the number of requested nodes), but the workers got stuck in the SLURM queue (with the reason for such being labeled as "Priority"). Meanwhile, the master would run and eventually hit the wall-time, leaving the workers to die when they finally started.
Thinking that the issue might be my requesting too many SLURM jobs, I tried condensing the workers into a single, multi-node job using a workaround I found on github. Nevertheless, these multi-node jobs ran into the same issue.
I then attempted to get in touch with the cluster's IT support team. Unfortunately, they are not too familiar with Dask and could only provide general pointers. Their primary suggestions were to either put the master job on hold until the workers were ready, or launch new masters every 24h until the the workers could leave the queue. To help accomplish this, they cited the SLURM options --begin and --dependency. Much to my chagrin, I was unable to find a solution using either suggestion.
As such, I would like to ask if, in a Dask/SLURM environment, there is a way to force the master to not start until the workers are ready, or to launch a master that is capable of "inheriting" workers previously created by another master.
Thank you very much for any help you can provide.
I might be wrong on the below, but in my experience with SLURM, Dask itself won't be able to communicate with the SLURM scheduler. There is dask_jobqueue that helps to create workers, so one option could be to launch the scheduler on a low-resource node (that presumably could be requested for longer).
There is a relatively new feature of heterogeneous jobs on SLURM (see https://slurm.schedmd.com/heterogeneous_jobs.html), and as I understand this will guarantee that your workers, scheduler and client launch at the same time, and perhaps this is something that your IT can help with as this is specific to SLURM (rather than dask). Unfortunately, this will work only for non-interactive workloads.
The answer to my problem turned out to be deceptively simple. Our SLURM configuration uses the backfill scheduler. Because my Dask workers were using the maximum possible --time (24 hours), this meant that the backfill scheduler wasn't working effectively. As soon as I lowered --time to the amount I believed was necessary for the workers to finish running the script, they left "queue hell"!

Ability to lock dask worker till certain post task / steps are complete

Trying to submit task to worker and return results. However need to perform garbage collection on worker to avoid memory build up from existing task. Would like to perform gc async and return the value from worker but avoid the worker from picking new tasks till the gc is complete.
Looked into distributed.Lock a bit but not sure if that can help here. Also wondering if secede() would help here.
Python processes call gc.collect regularly. It is usually not necessary to call it manually.
If you want, you can call client.run(gc.collect) to run this function on all Dask workers.

What do KilledWorker exceptions mean in Dask?

My tasks are returning with KilledWorker exceptions when using Dask with the dask.distributed scheduler. What do these errors mean?
This error is generated when the Dask scheduler no longer trusts your task, because it was present too often when workers died unexpectedly. It is designed to protect the cluster against tasks that kill workers, for example by segfaults or memory errors.
Whenever a worker dies unexpectedly the scheduler notes which tasks were running on that worker when it died. It retries those tasks on other workers but also marks them as suspicious. If the same task is present on several workers when they die then eventually the scheduler will give up on trying to retry this task, and instead marks it as failed with the exception KilledWorker.
Often this means that your task has some other issue. Perhaps it causes a segmentation fault or allocates too much memory. Perhaps it uses a library that is not threadsafe. Or perhaps it is just very unlucky. Regardless, you should inspect your worker logs to determine why your workers are failing. This is likely a bigger issue than your task failing.
You can control this behavior by modifying the following entry in your ~/.config/dask/distributed.yaml file.
allowed-failures: 3 # number of retries before a task is considered bad

Starting one delayed job in Rails creates two processes

Initially I have no process for delayed jobs(as indicated by htop), then when I run the command RAILS_ENV=production bin/delayed_job start I got one delayed job worker, as indicated by files in tmp/pids. However htop indicates now that there are two processes, as shown in the picture below.
So why is this happening? The other delayed job consumes memory where I don't have much of it!, however its TIME+ is zero, so it didn't consume time, so what does this means ?
I guess these are actually not two processes but two threads of a single process. You can hide threads by typing the capital H key in htop. If you'll see just one line then, you'll prove that it's a single process.
Delayed job probably has some master thread that governs the worker threads (or just the single worker in your setup), watches the queues and runs the workers if needed. Threads share most of the memory so I rather don't think the resources consumption issue comes from the two lines in htop.

Erlang: Job Scheduling Over a Dynamic Set of Nodes

I need some advice writing a Job scheduler in Erlang which is able to distribute jobs ( external os processes) over a set of worker nodes. A job can last from a few milliseconds to a few hours. The "scheduler" should be a global registry where jobs come in, get sorted and then get assigned and executed on connected "worker nodes". Worker nodes should be able to register on the scheduler by telling how many jobs they are able to process in parallel (slots). Worker nodes should be able to join and leave at any time.
An Example:
Scheduler has 10 jobs waiting
Worker Node A connects and is able to process 3 jobs in parallel
Worker Node B connects and is able to process 1 job in parallel
Some time later, another worker node joins which is able to process 2 jobs in parallel
Questions:
I seriously spent some time thinking about the problem but I am still not sure which way to go. My current solution is to have a globally registered gen_server for the scheduler which holds the jobs in its state. Every worker node spawns N worker processes and registers them on the scheduler. The worker processes then pull a job from the scheduler (which is an infinite blocking call with {noreply, ...} if no jobs are currently availale).
Here are some questions:
Is it a good idea to assign every new job to an existing worker, knowing that I will have to re-assign the job to another worker at the time new workers connect? (I think this is how the Erlang SMP scheduler does things, but reassigning jobs seems like a big headache to me)
Should I start a process for every worker processing slot and where should this process live: on the scheduler node or on the worker node? Should the scheduler make rpc calls to the worker node or would it be better for the worker nodes to pull new jobs and then execute them on their own?
And finally: Is this problem already solved and where to find the code for it? :-)
I already tried RabbitMQ for job scheduling but custom job sorting and deployment adds a lot of complexity.
Any advice is highly welcome!
Having read your answer in the comments I'd still recommend to use pool(3):
Spawning 100k processes is not a big deal for Erlang because spawning a process is much cheaper than in other systems.
One process per job is a very good pattern in Erlang, start a new process run the job in the process keeping all the state in the process and terminate the process after the job is done.
Don't bother with worker processes that process a job and wait for a new one. This is the way to go if you are using OS-processes or threads because spawning is expensive but in Erlang this only adds unnecessary complexity.
The pool facility is useful as a low level building block, the only thing it misses your your functionality is the ability to start additional nodes automatically. What I would do is start with pool and a fixed set of nodes to get the basic functionality.
Then add some extra logic that watches the load on the nodes e.g. also like pool does it with statistics(run_queue). If you find that all nodes are over a certain load threshold just slave:start/2,3 a new node on a extra machine and use pool:attach/1to add it to your pool.
This won't rebalance old running jobs but new jobs will automatically be moved to the newly started node since its still idle.
With this you can have a fast pool controlled distribution of incoming jobs and a slower totally separate way of adding and removing nodes.
If you got all this working and still find out -- after some real world benchmarking please -- you need rebalancing of jobs you can always build something into the jobs main loops, after a message rebalance it can respawn itself using the pool master passing its current state as a argument.
Most important just go ahead and build something simple and working and optimize it later.
My solution to the problem:
"distributor" - gen_server,
"worker" - gen_server.
"distributor" starts "workers" using slave:start_link, each "worker" is started with max_processes parameter,
"distributor" behavior:
handle_call(submit,...)
* put job to the queue,
* cast itself check_queue
handle_cast(check_queue,...)
* gen_call all workers for load (current_processes / max_processes),
* find the least busy,
* if chosen worker load is < 1 gen_call(submit,...) worker
with next job if any, remove job from the queue,
"worker" behavior (trap_exit = true):
handle_call(report_load, ...)
* return current_process / max_process,
handle_call(submit, ...)
* spawn_link job,
handle_call({'EXIT', Pid, Reason}, ...)
* gen_cast distributor with check_queue
In fact it is more complex than that as I need to track running jobs, kill them if I need to, but it is easy to implement in such architecture.
This is not a dynamic set of nodes though, but you can start new node from the distributor whenever you need.
P.S. Looks similar to pool, but in my case I am submitting port processes, so I need to limit them and have better control of what is going where.