Currently I am using TFS vNext Run Functional Tests (RFT) using Test Plan. I would like to be able to run specific tests first in a specified order before running other tests. I thought that I could maybe do this by using a parent-suite that had tests that I wanted to run first, and then have a child-suite under that parent that would run all other tests. I am not sure if TFS executes suites in any particular order. I haven't found much documentation stating if parent-suites execute before their child-suites execute. Is this a safe assumption on my part or is there some other way to execute tests in a specific order using RFT?
For VSTS and TFS 2017 and later versions, you can order the test suites as per your needs. Prior to this capability, the suites were only ordered alphabetically. Now, using the drag-and-drop capability in Test hub, suites can be reordered among the peer suites or moved to another suite in the hierarchy.
Related
I have 2 executables, an app and an automation test app who will perform actions on the app. My automation tests are basically NUNIT tests who calls Chrome Web Driver.
Everything is hosted at TFS. In my build definition, i run sanity checks for every PR. I wanted to expand that. The automation tests are divided into many different categories (being Sanity a category). I've been seeing some stuff related to TFS Test Suits, and my idea was to make in a way whenever when someone makes a PR, he could choose some test category to run on that PR using that build. So in a easyer way of sayng, if my PR changes how 'blue buttons work' ill run the 'blue buttons test suit' on my pr.
Would using Test Suits be the best solution for this ? Has any1 done this or have any nice information on how to achieve this ?
Thanks for any responses !! Best regards !
You could be able to use the Visual Studio Test Agent Deploy and Run Functional tests steps in your build definition to run auto tests on build agents.
Associated test methods with test cases in Visual Studio.
Create a build definition to build your project and add the 2 steps I mentioned above. In the Run Functional Test step, select the test suites which contains those test cases in step1.
More details please refer this blog: Executing Automated tests in Build vNext using Test Plan, Test Suites
My managers want we to determine which tests might have to be run, based on coding changes that were made to the application we are testing.
But, it is hard to know which tests are actually needed to be re-verified as a result of a code change. What we have done is common to test the entire area where the code change occurred / or the entire proj, solution.
We were told this could be achieved by TFS build or MTM tools. Could someone share the details?
PM:We are running on TFS 2015 update4,VS2017.
There is a concept of Test Impact Analysis which helps in analysis of impact of development on existing tests. Using TIA, developers know exactly which tests need to be verified as a result of their code change.
The Test Impact Analysis (TIA) feature specifically enables this – TIA
is all about incremental validation by automatic test selection. For a
given code commit entering the pipeline TIA will select and run only
the relevant tests required to validate that commit. Thus, that test
run is going to complete faster, if there is a failure you will get to
know about it faster, and because it is all scoped by relevance,
analysis will be faster as well.
Test Impact Analysis for managed automated tests is available via a checkbox in the 2.* preview version of the VSTest task.
If enabled, only the relevant set of managed automated tests that need to be run to validate a given code change will run. Test Impact Analysis requires the latest version of Visual Studio, and is presently supported in CI for managed automated tests.
However this is only available with TFS2017 update1(need 2.* preview version of VSTS task). More details please refer this blog: Accelerated Continuous Testing with Test Impact Analysis
I have a build which executes the Coded UI tests on TFS. When I run the build, I've noticed that the tests are executed in the alphabetical order of the name of the test methods.
I tried setting the order in MTM but later came across this which states:
Please note this only applies to the manual tests but not automated
tests. For automated tests, the order you set here will not be
respected during test execution
Is there any way that I could specify the order in which the tests are to be executed?
To run tests in order in Vnext build , you could add an Ordered Test file in your test project and run it in Vnext Build.
In the Test Drop location put the complete Project, and in the Executions options put the ordered test.
You can use Ordered Tests which are explained here: https://msdn.microsoft.com/en-us/library/ms182631.aspx
I'm trying to setup TFS 2010 Lab Management based Automated Testing system and I have a "Test suite" (Created in TFS Test Manager) with following tests:
1) Start and Login
2) Create group
3) Create user and add to the group
These have order specified properly in Testing Center->Plan->(Test suite)->Order column
However, when they are executed (on TFS Lab Management Build) by Test Agent they run out of order: 2nd then 1st and then 3rd.
Is there a way to make Test Agent run these tests in order?
Thanks.
Create an Ordered Test, it's a simple list of which test methods should run and in what order.
I also had the same issue. I solved it by installing VS2010 Service Pack and TFS 2010 Service Pack in both the Test controller machine and Test agent machines. Please go through the following link for more details
http://social.msdn.microsoft.com/Forums/en-US/vsmantest/thread/29ac3c7b-b0cd-40f3-9992-f5f3c2285331
Unfortunately, There's a blog regarding ordering test cases which says:
Please note this only applies to the manual tests but not automated
tests. For automated tests, the order you set here will not be
respected during test execution.
http://blogs.msdn.com/b/vstsqualitytools/archive/2009/11/21/run-your-tests-in-the-order-you-want.aspx
I don't know if it's a new feature but you can create Ordered tests. Just right click on your project in Solution Explorer and choose Add -> Ordered Test. Select you tests in order.
In Test Explorer, run you ordered test.
Details are in the link below but all I had to do is what I'd said above. I am using VS 2015 Enterprise.
https://msdn.microsoft.com/en-us/library/ms182631.aspx
Some background: I am not a tfs guy and I dont know much about build scripts etc.
1 - Is there a way to run tests for every check-in TFS? What I'm dreaming is, if any of the tests is failing then build server rejects the changeset. Is it possible with TFS or should it be some other tool like Hudson, Cruise Control etc? What are the other powerful tools?
2 - Does using such a tool make it possible to run only portion of tests, not all of them (ie only unit tests, not integration tests)?
I am not interested in technical details like how it can be done technically, as it is our tfs team's job. Rather I am after some high level info about the possibilities?
In TFS you have what's called check-in policies. With those in place you could forbid checking-in something without all of the unit tests passing. You could even enforce FxCop rules, etc... but that would be cruel to your developers.
If you already have the Continuous Integration build set up, then change the trigger to Gated Check In, this will do exactly what you want. When a developer tries to commit, TFS will start the build, if the build fails then the check in will be aborted and instead TFS will create a shelveset of the changes.
As for running a portion of the tests, you would probably need to create a test list in your VSMDI that defines the tests you want to run and then configure the build to use that list.