I try to migrate test cases from TFS 2010 to 2013 version.
So, i can get WorkItem from TFS 2010, but dont know how to set it to 2013?
Please,tell me how to write existing WI (TestCases) into TFS 2013.
Thanks.
You can create Test Cases from MTM or TFS Web Access (or via the TFS API).
If you need to do a bulk migration you can use tcmimport tool (google it), to migrate data via Excel, or one of the several TFS Migration Tools (that often cost money).
Related
What are the best practices to migrate workitems say PBIs/Features manually from TFS to VSTS? And how to ensure we don't lose any linking to changesets or other linked child workitems?
Have referred the below link and the migration tool mentioned is deprecated and would like to know any other options which will help to migrate the data.
How to migrate work items from TFS to VS Team Services (VS Online)
The recommend way for now is using Migrate to Visual Studio Team Service, a way import your TFS Database into Visual Studio Team Services which definitely along with data.
However, currently only the following versions of TFS are supported for import with this tool:
TFS 2017 Update 3
TFS 2018
You may have to upgrade your TFS server to use. Alternative, the Microsoft official option is using public API-based tools.
Personally, even though Team Foundation Server Integration Tools has been deprecated. You could still use this solution in your case.
Besides, if you have no work item customization, then OpsHub is an
option. VSTS Sync Migration Tools is another way. But none offer a full fidelity migrations. Each tool has its own limitations.
We need to migrate projects in TFS from one server to another. On source server we have TFS 2010 with several VS.NET projects in the DefaultCollection. On the destination server, we have TFS 2013 with an empty DefaultCollection but 2 other collections in use by other developers. Each instance of TFS has its own SQL Server.
The problem we face is how to take the DefaultCollection from the TFS 2010 server and place it on the TFS 2013 Server?
I'm aware of several articles about migration but have not found one that exactly fits our situation. I appreciate any ideas anyone may have.
This is a very straightforward scenario.
Something along these lines should work:
Detach DefaultCollection from TFS 2010 using the admin console.
Take a backup of your TFS 2010 DefaultCollection database
Migrate the database to your TFS 2013 database server
Attach the TFS 2010 DefaultCollection database in TFS 2013 via the admin console. As part of the attaching process, you should be able to rename it.
The team project collection database will be upgraded to TFS 2013 and made available to users. At that point, you can go back and clean up unneeded project collections and rename things if you'd like.
Always take backups before you attempt any sort of migration or upgrade. I always recommend performing the upgrade against a test environment first.
HELP!!
I'm learning on the fly here with no training whatsoever! I'm a system administrator who is responsible for supporting the developers. They use Visual Studio, TFS, Plastic SCM and TeamCity amongst other tools.
My task was to get TFS 2015 and SQL Server 2014 installed on a new VM. This I have done but my biggest task now is setting up TFS which seems complicated.
For your information, The developers use TFS 2012 as a Kanban board.
Can anyone point me in the right direction to documentation that simply explains how to copy a project from one collection to another? I'm reluctant to move the project to the new version of TFS without testing the current project.
Thanks in advance.
You cannot copy a single project, there is the TFS integration platform, but it sucks and doesn't officially support TFS 2015
I would say your best bet is to follow the following steps.
In TFS 2012, detach the collection using the TFS Admin Console.
Backup the collection database in SQL server
Copy the backup to the new SQL server
Restore the Database
In the TFS Admin Console in TFS 2015, attach the collection
Wait for TFS to update the Database Schema.
You should now have the full team project collection available in the new server.
I need to bring backlog tasks from a proprietary system to TFS 2013.
I came across an extension called "Team Foundation Server Integration Tools" and "Team Foundation Server SDK" but they support up to TFS 2012.
Is there any product I could use to create backlog tasks in TFS through REST or other means?
The 2012 integration tools work fine against TFS 2013, you only need to install the TFS 2012 Client Object Model. The 2012/v11 adapter works against TFS 2012-2015 and Visual Studio Online.
There are a few features which are unsupported:
Migration of Test results
Migration of Work item Tags
Kanban colum states
In addition to the items already listed on the Toolkit's page.
Alternative products for work item migrations are:
Tasktop Sync
OpsHub Integration Manager
Should you want to manually code up the migration then the TFS 2013 Client Object Model will have all the functionality you need. You're looking for the WorkitemStore class as your main starting point to create and modify work items.
An alternative approach you may want to investigate is to do an Excel import.
We are planning to upgrade from Tfs 2012 to Tfs 2013. Can anyone help me understand the difference in process templates between them? We use all three process templates for different projects.
The changes are very minor, except for:
The introduction of Portfolio backlogs.
Test Plans and test Suites are now Work Item Types (TFS 2013 update 3).
The AgileConfig and CommonProcessConfig files have been merged to a single file inside the template
The minor changes:
Git support for the Source Control options
Stackrank type fields are now hidden by default (because Agile task boards are now features of the Standard CAL).
Tag field support through the API.
The easiest way to visualize all differences is by comparing them through the TFS Team Project Manager which can be downloaded here.
TFS 2013 did not work well with our existing workspaces defined on remote network drives. TFS 2012 did work with this configuration.
After working several hours with our System Administrators, we gave up on trying to get the trying to get the existing network drive workspaces to work with the TFS 2013. Converting the workspaces to local drive locations enabled us to work with TFS 2013.