I've been looking into change the process template on a Team Project, but still have a few questions. I'm looking to move from MS Agile v5 to TeamPulse v1. There are no existing work items that we care about, so no need to move those over, however we do want to keep the existing source control history/branches.
With this in mind what is the best method to use? I am currently looking at using witadmin but am also considering TFS Integration Tools (MS or CodePlex versions). I think these are essentially my only options.
Do I need to worry about mapping existing fields to those in the new template if I don't intend to keep the current items?
Any additional advice would also be welcome.

It is not possible to explicitly change the Process Template, though it is possible to import the new work item type definitions using witadmin
I found the following answers helpful in finding a solution:
https://stackoverflow.com/a/2999219/509356
https://stackoverflow.com/a/5664531/509356

If you don't need any existing workitems I recommend to create a new team project with TeamPulse v1 and migrate only the source with the TFS Integration Tool. The problem with the witadmin solution is that you won't be able to delete the old workitem definitions and that could lead to confusions.

Related

Add a field to a work item in tfs 2017

I have a request to add a new field to a work item and we are using TFS 2017. My organization has done this before in previous versions of TFS. However, I remember customizing any process template to add new fields causes headaches when upgrading to the next version of TFS.
My question is if this is still a concern? If so, is there a work-around for this issue?
Thanks!
Tim
Basically, you would have the same procedure if you want to upgrade a on-premises TFS with customizations.
So, before you customize, you should understand which customizations support an easy update path and which do not.
Recommended practices:
Identify the best options for customizing WITs that support your
tracking requirements. When you change objects that track work items,
you should identify how these changes will affect existing and future
team projects.
Put processes and all XML definition files under version control. Do
not deploy objects that you define but have not stored in a
repository.
Test your customized objects just as you would test your software.
Minimize the number of custom fields that you introduce. Minimize the
number of fields that you make reportable.
Please refer to the link below for more information:
https://learn.microsoft.com/en-us/vsts/work/customize/on-premises-xml-process-model#before-you-customize

How to change TFS Process Template

I am about to move a local TFS project to visualstudio.com
When the project was created, it was created with a SCRUM process template. However, only source control functionality was used (except about 20 work items which can be deleted).
I want to add them to visualstudio.com as a project of process template type CMMI.
I am reading confusing (and seemingly conflicting) information on-line about how it is done (and if it is even possible).
Has anyone does this before (or have experience with TFS migrations in general)? Any input appreciated!
Thanks
You can use TFS integration tool to process migrating Source control and work items. As you want to change the process template, you need to put the mapping file during migration. More information, you can refer to this blog: https://mohamedradwan.wordpress.com/2015/05/14/migration-to-vso-visual-studio-online-with-different-tools/

Scrum Template Upgrades?

When you upgrade your tfs server does it automatically update the scrum template your using for existing projects or do you have to do that manually? If manually what is involved?
The team project we are working on was defined in 2012 RTM but our server is now # 2013.3. We haven't used the work items that much at this point (at little bit initially for a pilot project) but we are to push harder for our organization to use scrum so we want to make sure we are on the latest/greatest template before we start.
Your process template is not automatically updated. As long as you haven't made any changes to the original process template, upgrading is quite easy.
You enable new features by running the Configure Features Wizard in your team projects configuration page.
If the automatic update fails, you will get a message describing the errors it encountered. Now you will have to apply those updates manually which is also described on MSDN but is a bit harder.
A not so nice but easy way is to remove all work items and process data from your project and then add the newest items. Martin Hinshelwood has some great guidance on how to do this.

TFS 2010 - Create a new project from an existing one in TFS

I need to create a new project from an existing one in TFS. This is for source control only. I do not need to copy any work items.
so now i need to create NewTeamProject in NewProjectCollection and use the source branch of OldTeamProject in OldProjectCollection.
Kindly advise to go ahead with this.. Thanks a lot for your help in advance..
Manual Split
Create a new team project in your existing collection
Pick the branch from team project option in the creation wizard
Follow the split a team project collection guidance
However, I have a feeling that this will not bring all the history along with it, and it's not a particularly nice option, especially when it comes to the collection splitting.
TFS Integration Tools
Another way is to use the tfs integration platform, which basically replays all the checkins on a new team project, which can be in your new collection. You will lose the original date/time of the checkin, due to the way this program works but will still be able to see what each checkin changed.
TFS Integration Tools
Tfs integration tools blog posts and references
There is one risky way to get your timestamps correct, by manually updating the database

Renaming TFS2010 Team Project

Is it possible to rename a TFS2010 team project?
The project in question is based on the CMMI 5.0 team project template, but it has been modified with several custom modifications (new WITs and link types).
For a rename to be feasible, all history must be maintained.
In all: No, it can't be done.
Your only shot is to create a new Team Project named as you 'd like and then move everything to it. This involves serious work done by hand.
After that, you can't erase your old TeamProject - you will loose the history. You can lock it and make it unavailable to everybody.
After having done this a few times we think about the names of our Team Projects a lot. If at some point their name is(gets) wrong, I 'd say we 'll live with the mismatch.
Unfortunately, team projects in TFS are not able to be renamed in TFS 2005, TFS 2008, or TFS 2010. It's currently the #1 feature on the Visual Studio User Voice site for TFS. If this is something that's important, I'd recommend putting some votes on that feature: http://visualstudio.uservoice.com/forums/121579-visual-studio/suggestions/2037605-rename-project-in-tfs
As far as I know you can create a new TeamProject and move your sources while maintaining history. Not sure if work items are preserved even when you delete/destroy the original TeamProject though.
As per the other comments "No, you can't", when we do it here we create a new project and then migrate source and work items over using the TFS Integration Platform, then delete the original project