Currently I am polling SCM
H H(0-8) * * 5
Which I intend to mean: poll between midnight and 8am on Friday.
What I would like is to poll every OTHER Friday.
The accepted answer does not work in Jenkins:
Invalid input: "0 0-8 * * 5/2": line 1:12: unexpected token: /
So take a look at this answer (and vote that up in case it helps):
H H 8-14,22-28 * 5
"Run at some hour and some minute (see here for the meaning of H) every Friday (=the 5th day, see here), if that Friday happens to be between day 8-14 or 22-28 of month." Looks good in my local Jenkins, skipping the run on January 31st:
Would last have run at Friday, January 24, 2020 12:39:59 AM UTC; would next run at Friday, February 14, 2020 12:39:59 AM UTC.
I haven't tried this in Jenkins, but I believe the normal cron syntax would be: 0 0-8 * * 5/2
The following statement helps you to run it bi-weekly at 08:00 A.M on Friday.
00 08 */2 * 5
Related
I have to build a job everyday at 09:29AM(UTC) but it's building at 11:AM ( UTC )
My cron is:
H 09 * * 1-7
What can be the cause if cron is not an issue? Or is it ?
Option H takes the random min of the Hour. for a specific time 9:29 AM Cron Expression should be
29 09 * * 1-7
Also for timing can you confirm the Timezone and Daylight option settings.
The requirement for my pipeline schedule is from 09:00 pm to 04:30 am I wrote the schedule like this triggers { cron('H H(21-4:30) * * *') } but it did not work, so how to correct this?
I think following cron will work for you.
H/30 21-23,0-4 * * *
At every 30th minute past every hour from 21 through 23 and every hour from 0 through 4.
I just want to run the job twice per week. Every Sunday 11 PM and every Friday 11 pm I just want to trigger the job automatically. I successfully implemented for one scheduler but not sure how to use two in single .
Sunday scheduler :
H 11 * * 0
Friday scheduler:
H 11 * * 6
For scheduling the job below pattern need to be followed:-
0 - Sun Sunday
1 - Mon Monday
2 - Tue Tuesday
3 - Wed Wednesday
4 - Thu Thursday
5 - Fri Friday
6 - Sat Saturday
7 - Sun Sunday
For your case you can follow the below:-
0 23 * * 0,5
You better understanding of "H" in Jobs Scheduler follow this:
Maybe something like this. Note there's a couple changes from your example, changed 11 to 23, 11 is 11am, 23 is 11pm and using 5 instead of 6 for Friday.
H 23 * * 0,5
But note with the "H" it isn't going to run at exactly 11pm, from the Jenkins docs:
The H symbol can be thought of as a random value over a range, but it
actually is a hash of the job name, not a random function, so that the
value remains stable for any given project.
If you want it to run closer to 11pm, maybe something like this
H(1-5) 23 * * 0,5
I am trying to run Jenkins job everyday at 10 AM and 10 PM . How do i do that?
Currently i use the below to run at 12 AM and 12 PM . Am not aware how to change it.
0 0-23/12 * * *
Its difficult to acheive it with just a single crontab entry, what you can do is to have a 2 crontab entry like below :-
for job which you want to run daily at 10 AM :-
0 10 * * *
And for 10 PM job 0 22 * * *.
Here first entry denotes the minute, second denotes the hour and then day,month and week.
Just click the "?" icon to the right of the "Schedule" field, and you'll see a detailed explanation of the syntax available there.
If you want it to run at 12am and 12pm, I would guess you would just do this:
0 0,12 * * *
Suppose you want to run a jenkins job at 4:30 AM , monday to saturday, then you can use below script under your jenkins build trigger:
30 04 * * 1-6
1-6 denotes monday to saturday
Coming back to your question, you can configure 2 entries under your build trigger to run Jenkins job everyday at 10 AM and 10 PM in jenkins as shown below:
00 10 * * 1-7
00 22 * * 1-7
I have this 'Build periodically' option with the following 'Schedule':
H 6,13 * * *
Meaning that I want this job to be run everyday at 6:00 and 13:00.
I noticed that it does not run at the specified time but 34 minutes later instead. These are the last builts:
#306 12-feb-2015 6:34
#305 11-feb-2015 13:34
#304 11-feb-2015 6:34
#303 10-feb-2015 13:34
#302 10-feb-2015 6:34
Plus, under the 'Schedule' text area there is a note saying:
Would last have run at Thursday, February 12, 2015 6:34:42 AM CET;
would next run at Thursday, February 12, 2015 1:34:42 PM CET.
This is not a big deal, but it is a bit annoying that there is a 34 minutes delay. Does anyone know why this is happening and how to solve it (without manually adding this delay on the schedule)?
Replace the H by 0 to have 6:00.
The H is intended to distribute tasks over the hour, so not all Jenkins tasks start exactly at 06:00 etc. (so it is not a delay, but a different way of scheduling).
Two different tasks scheduled both at H 13 * * * will start at different minutes but still between 13:00 and 13:59:59, so they won't make your system too slow. The H value is the job specific hash value, so it will still be a constant within the job, but different between jobs.