I am building a educational service, and it is a rather process heavy application. I have a lot of user actions triggering various actions, some present, some future.
For example, when a student completes a lesson for his day, the following should happen:
updating progress count for his user-module record
checking if he has completed a particular module and progressing him to the next one (which in turn triggers more actions)
triggering current emails to other users
triggering FUTURE emails to himself (ongoing lesson plans)
creating range of other objects (grading todos by teachers)
any other special case events
All these triggers are built into the observers of various objects, and the execution delayed using Sidekiq.
What is killing me is the testing, and the paranoia that I might breaking something whenever I push something. In the past, I do a lot of assertion and validations checks, and they were sufficient. For this project, I think this is not enough, given the elevated complexity.
As such, I would like to implement a testing framework, but after reading through the various options (Rspec, Cucumber), it is not immediately clear what I should be investing my effort into, given my rather specific needs, especially for the observers and scheduled events.
Any advice and tips on what approach and framework would be the most appropriate? Would probably save my ass in the very near future ;)
Not that it matters, but I am using Rails 3.2 / Mongoid. Happy to upgrade if it works.

Testing can be a very subjective topic, with different approaches depending on the problems at hand.
I would say that given your primary need for testing end-to-end processes (often referred to as acceptance testing), you should definitely checkout something like cucumber or steak. Both allow you to drive a headless browser and run through your processes. This kind of testing will catch any big show stoppers and allow you to modify the system and be notified of breaks caused by your changes.
Unit testing, although very important, and should always be used in parallel with acceptance tests, isn't for doing end-to-end testing, Its primarily for testing the output of specific methods in isolation
A common pattern to use is called Test Driven Development (TDD). In this, you write your acceptance tests first, in the "outer" test loop, and then code your app with Unit tests as part of the "inner" test loop. The idea being, when you've finished the code in the inner loop, then the outer loop should also pass, and you should have built up enough test coverage to have confidence that any future changes to the code will either pass/fail the test depending on if the original requirements are still met.
And lastly, a test suite is something that should grow and change as your app does. You may find that whole sections of your test suite can (and maybe should) be rewritten depending on how the requirements of the system change.

Unit Testing is a must. you can use Rspec or TestUnit for that. It will give you atleast 80% confidence.
Enable "render views" for controller specs. You will catch syntax errors and simple logical errors faster that way.There are ways to test sidekiq jobs. Have a look at this.
Once you are confident that you have enough unit tests, you can start looking into using cucumber/capybara or rspec/capybara for feature testing.

Related

How to report failures of automated tests with different severity?

How can I make a distinction between critical tests that fail (and that should be addressed immediately) vs. tests that fail, but aren't too critical (eg. a tab-view with the wrong default tab open)? It seems like most services (I am using CircleCI) only show you red or green.
I feel like I need some intermediate "orange" color in addition to the green and red colors. Is there any add-on or trick that could help us make the distinction between critical test failures and acceptable ones? (For example with annotations #non-critical?)
I am using Cucumber for testing a Ruby on Rails application.
EDIT
Here are two ways that could make sense (feel free to suggest other approaches):
One single build alert that is not just "green" or "red" but could be "yellow/orange" depending on which tests fail
Many builds, that can only be green or red, but that would be labeled
Build of "critical tests" succeeded with 0 errors (green)
Build of "non-critical" tests failed with 10 errors (red)
A better way would be to separate the execution between critical and non critical features. It would be quicker to detect a critical failure and you'd be able to run them more often.
To run the critical features tagged with #critical :
cucumber --tags #critical
To run the non critical features not tagged with #critical :
cucumber --tags ~#critical
Documentation:
https://github.com/cucumber/cucumber/wiki/Tags
I strongly recommend against having tests that are 'non-critical'. A binary pass/fail result is simple to manage: a suite either passes and all is well, or it fails and needs to be fixed. Whenever I've seen a test suite divided into levels of importance, the team immediately began paying attention only to the tests in the highest-importance group and more of the less-important tests were allowed to fail.
Instead, if a test isn't considered important enough to be fixed, delete it. Even better, if a feature isn't considered important enough to be tested, remove or simplify it so there is nothing to test.
Note that both the product owner and developers get to have input on what's important enough to be fixed. For example, if the developers have a standard of 100% code coverage and a test is the only test that provides some of that coverage, the developers would be right to insist that the test be kept passing even if the feature that it tests isn't considered critical by the product owner. Although that would then suggest that the feature should be removed or simplified so that the test wouldn't be needed by developers either.

Are there common reasons why Cucumber tests fail 60% of the time on otherwise passing functional code?

I recently started working on a project that has all passing cucumber tests. But I would say 60% of the time they fail on Timeouts, or just all together random intermittent errors. So roughly 1/4 times everything will pass and be green.
Are there common reasons for this sort of intermittence? Should I be concerned?
Acceptance tests may be something tricky on most of time.
You gotta check the async part of your code (Long database transactions, Ajax, MessageQueues). Put some timeout that makes sense for you, for the tests and for the build time (a long build time is not pretty good. I think that 10 minutes is acceptable, more than that, you can review your tests, if they are good enough).
Other problem is browser (if you're using it), it can take a lot of time to warm-up and start all tests.

Some Rails unit testing questions (using Shoulda + Factory girl)

I have a couple of complicated objects to stub out (instances of gems I use). Where can I centralize these stubs to make them available to all tests?
How can I programatically clear the DB between tests without rake:test? I want to quickly run individual tests through textmate, but doing so will error out since it doesn't clear the DB between tests
The tests run slow since it has to spin up a Rails instance. How to speed up the tests? Especially while writing the tests and wanting to quickly run changes
1) You can either put them in test_helper.rb to make them available to all tests or you could write your own module which contains those methods and then include that module in the tests that require those stubs.
2) You could put Model.destroy_all (or .delete_all if appropriate which would be quicker) in your test setup method to strip out those models that you are no longer interested in.
However, if you are running tests in transactions (and your database supports transactions) then you shouldn't need to clear out any data because the creation of the data and the test will run in a transaction which will then be rolled back clearing the data automatically.
3) Not so sure on this one. I had this problem a lot developing on Windows but not so much on *nix. You could look into some kind of continuous testing but there's still going to be a delay on feedback. It might be worth investigating what is causing the rails environment to be so slow starting - it might be something you can skip in your testing environment.

Automated testing with Ruby on Rails - best practices

Curious, what are you folks doing in as far as automating your unit tests with ruby on rails? Do you create a script that run a rake job in cron and have it mail you results? a pre-commit hook in git? just manual invokation? I understand tests completely, but wondering what are best practices to catch errors before they happen. Let's take for granted that the tests themselves are flawless and work as they should. What's the next step to make sure they reach you with the potentially detrimental results at the right time?
Not sure about what exactly do you want to hear, but there are couple of levels of automated codebase control:
While working on a feature, you can use something like autotest to get an instant feedback on what's working and what's not.
To make sure that your commits really don't break anything use continuous integration server like cruisecontrolrb or Integrity (you can bind these to post-commit hooks in your SCM system).
Use some kind of exception notification system to catch all the unexpected errors that might pop up in production.
To get some more general view of what happened (what was user doing when the exception occured) you can use something like Rackamole.
Hope that helps.
If you are developing with a team, the best practice is to set up a continuous integration server. To start, you can run this on any developers machine. But in general its nice to have a dedicated box so that its always up, is fast, and doesn't disturb a developer. You can usually start out with someone's old desktop, but at some point you may want it to be one of the faster machines so that you get immediate response from tests.
I've used cruise control, bamboo and teamcity and they all work fine. In general the less you pay, the more time you'll spend setting it up. I got lucky and did a full bamboo set up in less than an hour (once)-- expect to spend at least a couple hours the first time through.
Most of these tools will notify you in some way. The baseline is an email, but many offer IM, IRC, RSS, SMS (among others).

Fixtures and Selenium and Rails (oh my?)

What data do you use with Selenium tests on Rails apps? Do you load from fixtures? Use an existing dev db? Use a separate (non-fixture) db?
I'm considering my options here. I have a Rails app with a large Selenium test suite that runs on a modified version of Selenium Grid. Part of the process, right now, is loading a large set of fixtures, once, before the test suite runs. It's a LOT of data. Most of it is reporting info exported from our production db. When I set it up originally, I exported the data to yaml from Oracle.
Now there's been a schema change in some of the reporting tables, so of course I have to regenerate the fixture data. There is so much of it that it's not worthwhile to edit the files by hand. But it seems inefficient to have to regenerate for every little schema change - not to mention that it's yet another step to remember to do. Is there a better way?
EDIT: I originally intended to load the fixtures before each test and unload them after each test, like regular Rails tests. But it takes about 15 minutes to load the fixtures due to this reporting data. There are 200+ tests, and the suite runs every 12 hours. I cannae bend spacetime captain!
EDIT 2: I also agree that having this big set of fixtures is a bad smell. I'm not sure how to pare it down, though, because the reports aggregate a lot of data and much of the value of the selenium tests is that they test the reports.
Even if it's a small set of data, though...it's still another set to keep co-ordinated with schema changes. (We have a separate, smaller set for unit, functional, and [Rails] integration tests.)
Which brings me back to my original question - are there other options besides doing it by hand, or remembering to regenerate them each time?
If you can, the best possible thing to do is have a system in which each Selenium test gets it's own data state (ie: DB tables dropped and recreated, bootstrap data re-inserted, and caches cleared). This is easier said than done and usually is only possible if the project planned for it from the start.
The next best thing is to have a consistent DB state for each test suite/run. This is not as nice since there is now a strong chance that some tests will depend on the success of previously run tests, making it more difficult identify true failures vs. false negatives.
The worst case, IMO, is to use a static DB in which each test run mutates the date. This almost always leads to problems and is usually a "project smell". The key to doing it the "right way" (again, IMO) is to be vigilant about any state/schema change and capture it as part of the automated test/build process.
Rails does a good job with this already with Migrations, so take advantage of them! Without knowing your situation, I'd generally question the need to run Selenium tests against a snap of the full DB. Most DBs can (or should) be distilled down to less than 1MB for automated testing, making automated schema migrations and data reset much more efficient.
The only time I've seen a "valid" reason for massive DBs for Selenium tests is when the DB itself contains large chunks of "logic data" in which the data affects the application flow (think: data-driven UI).
I think you're asking two questions here that are intertwined so if I'm to break it down:
You want to get test data into and out of your DB quickly and fixtures aren't doing it for you.
You've been burnt by a schema change and you want to make sure that whatever you do doesn't require eight iterations themed "fiddling with the test data...still" :)
You've got a couple of alternatives here which I've hashed out below. Because you've mentioned Oracle I'm using Oracle technologies here but the same thing is true for other DB platforms (e.g. Postgresql):
Rake tesks that call PL/SQL scripts to generate the data, nasty horrible evil idea, don't do it unless there's no other option. I did it on one project that needed to load in billions of rows for some infrastructure architecture tests. I still sulk about it.
Get your DB into a dump format. For speedy binary dumps check out the exp/imp and data pump utilities. This will allow you quick setup and teardown of your DB. Certainly on a rails project I worked on we used rake tasks to exp/imp a database which had around 300k records in under a minute. Also check SQLLoader which is the logical dump utility, as its logical its slower and requires you to have control scripts to help SQLLoader understand the dumps. However, the benefit of the logical dump is that you can run transformation scripts over them to massage the data into the latest format. Sadly though just like fixtures all these tools are pretty sensitive to change in the schema.
Use a plugin such as Machinist or Factory Girl to make the generation of the data nicer. You still incur the penalty of using ActiveRecord to setup the DB but these fake object generators will help you stay close to you migrations and are a lot less hassle to maintain than fixtures.
Combine approaches 2 and 3. What happens here is that you make some test data with say Machinst. You export that test data to a dump and then reload the dump during each test run. When the schema changes update the Machinist config and re-export.
Hope that helps.
I'm currently on a project with an enormous Selenium test suite--actually, the one Selenium Grid was written for--and our tests use a small amount of reference data (though we don't use Rails YAML fixtures) and object factories for one-off data needed for particular tests.
Alternatively, on many of the ThoughtWorks Rails projects I've been on we've written checkin scripts that incorporate a number of pre-commit hooks--for example, running the tests before allowing a commit. One thing you might consider trying is writing (or customizing) a similar checkin script that will check for schema changes and reload the reference data as needed.
See e.g. Paul Gross's rake commit tasks on Github.

Resources