A Firebird database getting slow after a period of time is usually a sign of bad client transaction management. This can be easily checked by inspecting various transaction counters from the header page, which can be queried by running:
gstat -h <yourdatabase>
when your database becomes slow. For example: Pretty much all access libraries, when running transactions in auto commit mode (basically when you don't care about starting explicit transactions in your client application), are using COMMIT RETAINING, which basically blocks moving OIT/OAT forward.
Beside the gstat command-line tool, with Firebird 2.1 you also have the monitoring tables, in particular MON$TRANSACTIONS, to identify long-running transactions.

Related

How to implement rolling updates and a relational database?

I have an existing system that uses a relational DBMS. I am unable to use a NoSQL database for various internal reasons.
The system is to get some microservices that will be deployed using Kubernetes and Docker with the intention to do rolling upgrades to reduce downtime. The back end data layer will use the existing relational DBMS. The micro services will follow good practice and "own" their data store on the DBMS. The one big issue with this seems to be how to deal with managing the structure of the database across this. I have done my research:
https://blog.philipphauer.de/databases-challenge-continuous-delivery/
http://www.grahambrooks.com/continuous%20delivery/continuous%20deployment/zero%20down-time/2013/08/29/zero-down-time-relational-databases.html
http://blog.dixo.net/2015/02/blue-turquoise-green-deployment/
https://spring.io/blog/2016/05/31/zero-downtime-deployment-with-a-database
https://www.rainforestqa.com/blog/2014-06-27-zero-downtime-database-migrations/
All of the discussions seem to stop around the point of adding/removing columns and data migration. There is no discussion of how to manage stored procedures, views, triggers etc.
The application is written in .NET Full and .NET Core with Entity Framework as the ORM.
Has anyone got any insights on how to do continious delivery using a relational DBMS where it is a full production system? Is it back to the drawing board here? In as much that using a relational DBMS is "too hard" for rolling updates?
PS. Even though this is a continious delivery problem I have also tagged with Kubernetes and Docker as that will be the underlying tech in use for the orchestration/container side of things.
All of the following under the assumption that I understand correctly what you mean by "rolling updates" and what its consequences are.
It has very little (as in : nothing at all) to do with "relational DBMS". Flatfiles holding XML will make you face the exact same problem. Your "rolling update" will inevitably cause (hopefully brief) periods of time during which your server-side components (e.g. the db) must interact with "version 0" as well as with "version -1" of (the client-side components of) your system.
Here "compatibility theory" (*) steps in. A "working system" is a system in which the set of offered services is a superset (perhaps a proper superset) of the set of required services. So backward compatibility is guaranteed if "services offered" is never ever reduced and "services required" is never extended. However, the latter is typically what always happens when the current "version 0" is moved to "-1" and a new "current version 0" is added to the mix. So the conclusion is that "rolling updates" are theoretically doable as long as the "services" offered on server side are only ever extended, and always in such a way as to be, and always remain, a superset of the services required on (any version currently in use on) the client side.
"Services" here is to be interpreted as something very abstract. It might refer to a guarantee to the effect that, say, if column X in this row of this table has value Y then I will find another row in that other table using a key computed such-and-so, and that other row might be guaranteed to have column values satisfying this-or-that condition.
If that "guarantee" is introduced as an expectation (i.e. requirement) on (new version of) client side, you must do something on server side to comply. If that "guarantee" is currently offered but a contradicting guarantee is introduced as an expectation on (new version of) client side, then your rolling update scenario has by definition become inachievable.
(*) http://davidbau.com/archives/2003/12/01/theory_of_compatibility_part_1.html
There are also parts 2 and 3.
I work in an environment that achieves continuous delivery. We use MySQL.
We apply schema changes with minimal interruption by using pt-online-schema-change. One could also use gh-ost.
Adding a column can be done at any time if the application code can work with the extra column in place. For example, it's a good rule to avoid implicit columns like SELECT * or INSERT with no columns-list clause. Dropping a column can be done after the app code no longer references that column. Renaming a column is trickier to do without coordinating an app release, and in this case you may have to do two schema changes, one to add the new column and a later one to drop the old column after the app is known not to reference the old column.
We do upgrades and maintenance on database servers by using redundancy. Every database master has a replica, and the two instances are configured in master-master (circular) replication. So one is active and the other is passive. Applications are allowed to connect only to the active instance. The passive instance can be restarted, upgraded, etc.
We can switch the active instance in under 1 second by changing an internal CNAME, and updating the read_only option in each MySQL instance.
Database connections are terminated during this switch. Apps are required to detect a dropped connection and reconnect to the CNAME. This way the app is always connected to the active MySQL instance, freeing the passive instance for maintenance.
MySQL replication is asynchronous, so an instance can be brought down and back up, and it can resume replicating changes and generally catches up quickly. As long as its master keeps the binary logs needed. If the replica is down for longer than the binary log expiration, then it loses its place and must be reinitialized from a backup of the active instance.
Re comments:
how is the data access code versioned? ie v1 of app talking to v2 of DB?
That's up to each app developer team. I believe most are doing continual releases, not versions.
How are SP's, UDF's, Triggers etc dealt with?
No app is using any of those.
Stored routines in MySQL are really more of a liability than a feature. No support for packages or libraries of routines, no compiler, no debugger, bad scalability, and the SP language is unfamiliar and poorly documented. I don't recommend using stored routines in MySQL, even though it's common in Oracle/Microsoft database development practices.
Triggers are not allowed in our environment, because pt-online-schema-change needs to create its own triggers.
MySQL UDFs are compiled C/C++ code that has to be installed on the database server as a shared library. I have never heard of any company who used UDFs in production with MySQL. There is too a high risk that a bug in your C code could crash the whole MySQL server process. In our environment, app developers are not allowed access to the database servers for SOX compliance reasons, so they wouldn't be able to install UDFs anyway.

How to send SQL queries to two databases simultaneously in Rails?

I have a very high-traffic Rails app. We use an older version of PostgreSQL as the backend database which we need to upgrade. We cannot use either the data-directory copy method because the formats of data files have changed too much between our existing releases and the current PostgreSQL release (10.x at the time of writing). We also cannot use the dump-restore processes for migration because we would either incur downtime of several hours or lose important customer data. Replication would not be possible as the two DB versions are incompatible for that.
The strategy so far is to have two databases and copy all the data (and functions) from existing to a new installation. However, while the copy is happening, we need data arriving at the backend to reach both servers so that once the data migration is complete, the switch becomes a matter of redeploying the code.
I have figured out the other parts of the puzzle but am unable to determine how to send all writes happening on the Rails app to both DB servers.
I am not bothered if both installations get queried for displaying data to the user (I can discard the data coming out of the new installation); so, if it is possible on driver level, or adding a line somewhere in the ActiveRecord, I am fine with it.
PS: Rails version is 4.1 and the company is not planning to upgrade that.
you can have multiple database by adding an env for the database.yml file. After that you can have a seperate class Like ActiveRecordBase and connect that to the new env.
have a look at this post
However, as I can see, that will not solve your problem. Redirecting new data to the new DB while copying from the old one can lead to data inconsistencies.
For and example, ID of a record can be changed due to two data source feeds.
If you are upgrading the DB, I would recommend define a schedule downtime and let your users know in advance. I would say, having a small downtime is far better than fixing inconstant data down the line.
When you have a downtime,
Let the customers know well in advance
Keep the downtime minimal
Have a backup procedure, in an even the new site takes longer than you think, rollback to the old site.

Migrate Data from Neo4j to SQL

Hi I am using neo4j in my application and my structure is as following:
I am using Embedded Graph API
I have several databases that I point to using a pool that I maintain in my application eg-> db1, db2, db3, ..... db100
When I want to access a particular database I point to it using new EmbeddedGraphDatabase("Path to db(n)")
The problem is that when the connection pool count increases the RAM size being consumed by the application keep increasing and breaks down the application at a point of limit.
So I am Thinking of migrating from Neo4j to some other Database.
Additionally only a small part of my database is utilizing the graph structure.
One way for migration is that I write a script for it. Is there any better option?
My another question is what is the best Database so that my structure can be maintained.
Other view-point that I am thinking about is I can keep part of my data into Neo4j and shift another part to some other database.
If anything is unclear I can clarify.
Thanks in advance.
An EmbeddedGraphDatabase instance is not the equivalent of a "connection" in SQL. It's designed to run a long time (days, months). Hence starting/stopping is costly.
What is the use case for having hundreds of separate databases in the same JVM?
Your lots of small databases will perform poorly as the graphdb is designed to hold the whole datamodel on a single host.
Do you run a single JVM per database?
You can control the amount of memory used by neo4j by providing the correct properties for memory mapping and also use the gcr cache from neo4j-enterprise and control the cache size-property variables.
I think it still makes sense to keep the graph part in Neo4j and only move the non-graphy part.

PostgreSQL + Rails concurrency clarification

I'm building a background job that's updating users' statistics for a web application. The job currently takes 55-60 seconds, and I'm concerned about what would happen if a user were to try to load his stats page at the same time that job is running.
From what I've read about PostgreSQL and concurrency, if two clients attempt to access the same row (one updating and one reading), and I'm not explicitly starting any transactions, the first one just has to wait for the second one to finish.
So if I'm understanding that correctly, the only performance hit I'm likely to incur is on the infinitesimally small chance that a user tries to load his stats page at the same moment that the row is being updated. It's not like the whole stats table is locked up during the 55-60 second job unless I were to explicitly configure Postgres to do that, right?
Is that a correct interpretation? Are there other factors I'm missing?
(I mention the Rails part just in case it has any bearing on the above scenario)
(Also: the PostgreSQL version is 9.0.4)
It depends on transaction isolation level. If I've got your case - you are talking about Dirty Read avoiding delay. And YES, Dirty Read is impossible if you are using default isolation level. Reader will wait for the writer only when it will try to get the same row that is being updated.
Read Committed is the default isolation level in PostgreSQL. When a transaction runs on this isolation level, a SELECT query sees only data committed before the query began;
specs on ISOLATION

Rollback informix database

I have some code that uses an Informix 11.5 database that I want to run some tests against.
If the tests fail they will often leave the database in an inconsistent state that needs to be manually resolved before the tests can be run again.
I would like to automate this so that the tests do not require manual intervention before running the tests again.
My current solution is to write some code that does the cleanup, but this means the code must be maintained whenever potential new inconsistent states can occur in new features.
The code runs a lot of stored procedures, which themselves often use transactions. As Informix does not support nested transactions I can't just wrap up all the work in one big transaction.
Is there another way to create a checkpoint which I can restore the database back to?
You could create a virtual machine with an undo disk and after you run the test you can close the virtual machine without saving the changes. It's equivalent to like you never ran the tests!
If this is a development only server, how about taking a Level 0 ontape system archive before the test? I think this can be done via the sysadmin functions too (not sure though), so it can be automated. After the tests you just restore the archive.
Changing database state - and resetting it back to a known state - is one of the reasons that the Unit Test community spends time and effort avoiding testing against databases. It is a tough problem.
Informix 11.50 does support savepoints; however, it does not support one BEGIN WORK after another without an intervening COMMIT or ROLLBACK.
To the extent possible, have the tests create and load a set of tables with the known data. One way of achieving that is to create a whole new database for the test. However, this is only borderline feasible if you need to test with high volumes of data.
I don't think this issue is in any way unique to Informix - it is a general problem with testing DBMS operations.